Get complete information related to latest Window Ventilator Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Window Ventilator Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Window Ventilator Tenders.
Tender For supply of electric slaughterhouse (for animals) - primary & secondary chamber primary chamber* single chmber furnace of size 4270 mm x 1980 mm x 1820 mm.* plate thickness- 5 to 8 mm.* lining of interior of furnace- 400 mm wall cermaic blanketk, high aluminia refractory brick is-8-1994 line with insulation brick is 2042-2006* operation temperature- 800o c to 1000o c.* top smoke discharge for secondary chamber.* ash removal doors to be provided for ash collection after combustion.* ingtion- automatic.* temperature control- automatic* material loading- front gate- automaticsecondary chamber* operating temperature - 1050o c to 1250o c.* material of construction- mild steel with high aluminia refractory brick is-8-1994 line with insulation brick is 2042-2006.* made from is 2062 grade mild steel materials (or better) duty lined with insulation bricks, refractory bricks, hysil boards.* burner mounting arrangement with refractory burner block.furnace door:furnace door charging & discharging side fabricated from 5mm to 6 mm thickness door opening & closing automatic.ash door:* ash door (with casted cement lining) to remove nonhazardous ash from the chamber.* top inlet bottom smoke discharge for longer gas residence time.* furnace door charging & discharging side fabricated from 5mm to 6 mm thickness.* door opening & closing automatic/manual.refractory:{complete set of refractory shaped bricks for construction electric cremation of i.s. 8 bricks (approx. 1007nos bricks,insulation 4000 nos. refractory slid for construction of flue duct , as required, refractory heat resistant fire clay , ceramic blanket hysil board, asbestos ropes etc. as required for outer side of the furnace shall be constructed by red bricks by sand and cement as mortars and construction of chimney from basement of roof level including painting i.e. bricks portion shall be painted by two coats of red oxide as primer and to coats of synthetic enamel. (a) complete lining & assembling of entire cremation chamber according to standard size with proper arrangement of accommodation of heating elements, resting of dead body with sufficient opening for falling of ashes to the ash chamber & sufficient ventilation for fresh air spraying. (b) complete lining and assembling of entire cremation chamber according to standard size with provision of drawing out aces from the rear side and sufficient ventilation for fresh air injection. complete lining and assembling of entire cremation chamber according to the standard size with provision of air inlet supplying by fresh air blower and arrangement of multi ventilation path for fresh air}. osspl make, thermocouple heat sensor supply & fixing the thermocouple of heat sensing range 0 - 1200 c (cr.-al) sensor housed in s.s 304 casing of dimension 1200 mm long 22 mm od complete encased to and fitted terminal on other and for connection of compensating of 2 cores 0.5 aq. mm cr- al for heat sensing from thermocouple to temperature controller covered with asbestos embedded rope about 50 m length as per direction of eic., f.d. fan/centrifugal air blower with electric motor * supply and delivery at site, installation, testing and commissioing.* of fresh air injection system forced draft fan mild steel.* type: centrifugal.* capacity:- 500 cmh.* pressure:- 220 mmwg.* motor rating:- 2hp (kirloskar/crompton), burner assembly * total 2 nos. of lpg/cng/png fired automatic burner required.* the burner should be provided with comprising diffuser plate/ burner plate, photo cell housing electrodes with holding brackets, solenoid valve, electrodes caps, flexible hose pipes, spary nozzles, oil filter, blower, etc. connected with electric motor (each burner) & in built air regulator.* burners will work on auto on/off as per the set temperature for the combustion chambers.* the in-built bolwer will provide continuous air flow to the burners to prevent demages due to high temperature., supply and fixing of manifold with a p
Tender For design, manufacturing, testing, supply, installation, commissioning and after sales service of cab heating unit with de-fogging unit (lh & rh) along with anti-vibration mountings, prewired control panel, operating cum indication panel, inter-connecting ducts for defogging unit, air diffuser of defogging unitfor wind screen confirming to icf specification spec. no. icf/elec-098, rev.01, cs-01, cs-02 annexure-1 orlatest, suitable for air-conditioned self propelled inspection car (spic ac) coaches note: i) power and control cables for interconnection between heater units and operating cum indication panel, control panel shall be in the scope of purchaser. however the cables required for internal wiring of the defogging unit, cab heating unit, control panel and operating cum indication panel, mating connectors (shall be suitable for cables provided by the purchaser), ss mounting and earthing hardware, cable termination in the mating connectors with suitable crimping lugs/crimping contacts, wire end ferrules, cable markers, heat shrinkable tubes etc. shall be in the scope of the supplier as mentioned in the specification. [ warranty period: 24 months after the date of delivery ]