Get complete information related to latest Wooden Crates Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Wooden Crates Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Wooden Crates Tenders.
Tender For auction sale of depot miscellaneous scrap - (b) pl. no.98413200, w-6/jun-26/01: scrap woodencrates /offcuts /sleeper pilers etc, mostly firewood as available in the lot. (qty. 65 mt)
Tender For auction sale of metallic, non-metallic - disposal of unserviceable/obsolete items as per annexure-i (woodencrates, polythene cover black, empty al.ph3 bottles & miscellaneous etc.)
Tender For supply of head base gel pad size 200 x 50 mm , heel pads size 190 x 120 x 70 , silicone gel closed head ring 200 x 75 x 45 mm , silicone gel open head ring 200 x 75 x 45 mm , elbow base gel pad silicon base small , elbow base gel pad silicon base medium , elbow base gel pad silicon base large , elbow base gel pad silicon base xl , abdominal base gel pad silicon base small , abdominal base gel pad silicon base medium , abdominal base gel pad silicon base large , abdominal base gel pad silicon base xl , chest base gel pad small , chest base gel pad medium , chest base gel pad large , chest base gel pad xl , supraglottic airway device with integrated bite block gastric drainage port and four way connector airway tube should be short with more than 95 degree angulation , supraglottic airway device with integrated bite block gastric drainage port and four way connector. airway tube should be short with more than 95 degree angulation , silicone gel chest roll , peripheral nerve block needle echogenic 20g with catheter polyamide nylon 100cm with closed tip , peripheral nerve block needle echogenic 25g 190mm bevelled with catheter over system of 19g 18 point 7cm * /bid number : gem/2026/b/7639415 + /dated: 24-06-2026 ' ' / bid document 1 / 25
Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - woodencrates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - woodencrates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of plastic and rubber moulded items c c - hand grip, hand grip, p.u. foam armrest, pu foam armrest, integral skin armrest (with screw), end plug, dust cap for wheelchair, foot tip, cage, washer nylon, dust cap, pad foot rest, pad foot rest, washer, anti rattle collar, handle, end plug, tip end, insert stopper, polythylene bag-length-1275 mm, width-1200 mm & thick-100 microns (min) open at one side along the length (1275 мм).
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - woodencrates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]