Tender For corrigendum : supply of air quality monitoring system at tuticorin airport - sitc of partiulcate matter analyser , sitc of sulphur dioxide analyser and ambient oxides of nitrogen analyser , supply and fixing of multi gas calibrator and gas sampling system , supply of calibration gas cylinders , supply and fixing of oled tv with mini pc , supply of copper conductor armoured power cable , laying of pvc sheathed cable , supply and laying of hdpe pipe , sitc of junction box , supply and end termination of pvc sheathed or xlpe aluminium conductor cable , sitc of software and licenses for live dashboard and historical data in pc , providing online pcb connectivitity , sitc of software , sitc of min 4 channel data logger , sitc of data converter , laying and fixing of pvc sheathed or xlpe power cable , earthing with gi earth pipe , sitc of digital rh temperature pm 2.5 pm 10 monitoring analyser with remote transmitter and receiver , sitc of pc and necessary accessories, panel, 1 kva ups , sitc of ocems for 250 kld stp , supply of single mode 6 core armoured ofc , supplying and drawing of utp 4 pair cat 6 lan cable
Tender For supply of supply and installation 316l 1x1 cylinder nitrogen gas manifolds systems , supply and installation 316l 1x1 cylinder caorbondioxide gas manifolds systems , supply and installation 316l of one cylinder argon gas manifolds systems , supply and installation of 316l stainless steel seamless half inch tubing with required fittings supports clamps , supply and installation of half inch compression end ss 316l ball valve of 250 bar rated , analog 316 ss 4 inch dial vacuum gauge for nitrogen, carbon dioxide and carbogen gas , vacuum trap and nrv , supply and installation of ss 316l secondary regulator for nitorgen at each point of use , supply and installation of ss 316l secondary regulator for argon at each point of use , supply and installation of ss 316l secondary regulator for carbon dioxide at each point of use , disconnection of existing 1 inch metal gas pipe line , 4 inch pressure guages for co2 n2 and argon each 2 , installtion testing termination and commissioning of gas line with all joints orbital welding , supply and instalation ptfe ss braided cylinder onnection hose for carbon dioxide nitrogen and carbogen gas manifold system