Get complete information related to latest Zinc Powder Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Zinc Powder Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Zinc Powder Scrap Tenders.
Tender For supply of inorganic ethyl self curing zinc silicate primer to bhel spec aa56113 rev 02. , suitable thinner for inorganic ethyl self curing zinc silicate primer (pi item no 01) , high build epoxy mio cured with polyamide hardener as per bhel spec aa56112 rev 02 , suitable thinner for high build epoxy mio (pi item no 03) , high build gloss aliphatic acrylic polyurethane finish paint as per bhel spec aa56142. , suitable thinner for high build gloss aliphatic acrylic polyurethane finish paint (pi item no 05)
Tender For corrigendum : supply of side sill for lhb coaches as per drg. no.- le 11182 alt.- c, item to be supplied with red oxide zinc chromate primer coating. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of support complete for sliding door (lh & rh) for automobile carrier coach with side entry as per rdso drg. no. rdso/cg/drg/21015. one set consist of one no. of lh & rh each. item to be supplied with red oxide zinc chromate primer coating [ warranty period: 30 months after the date of delivery ]
Tender For supply of hex head bolt for traction motor fixing with suspension tube m30 x 140 mm. p 8.8, zinc plated, is-1364 as per clw drg. no. 1209-01.111-004 alt 5, item no.46, for use in tm type 6fra6068 f or wag9 &wap7 (3phase) loco. [ warranty period: 30 months after the date of delivery ]
Tender For supply of m-12 spring washer, bright zinc plated to is:3063 standard item as per drg.no. is:3063 as per specn. is:3063 [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of member (one set consists of lh- 01 no and rh- 01 no) as per drg no le1131 6 alt 'a' (for lh) and le11315 alt 'a' (for rh). item to be supplied with red oxide zinc chromate primer coating. [ warranty period: 30 months after the date of delivery ]