Tender For supply of transmission oil sae 30 servo sae30-c4, make-iocl, hpcl, bpcl or similar [ warranty period: 30 months after the date of delivery ]
Tender For supply of outdoor type transformer 250 kva 11 kv/416 volt, 3 phase, 50hz, oil cooled, copper wound completes with oil and other accessories as per is is: 1180(part 1) 2014 with amendment nos. 1, 2, 3, 4 or latest and supplied with all standard fittings mentioned in clause 20.1 of is:1180 (part 1) latest including fr eight charges and other charges if any. make: as per latest cee specification no cee/s/185/519/genl., date d 10/10/2023. make: indian make is approved. [ warranty period: 30 months after the date of delivery ]
Tender For supply of details of crossing bolts and nuts (1 in 12) off sizes with single coil spring washer and m.s.ta pered washer as per details attached at annexure "a" [ warranty period: 30 months after the date of deli very ]
Tender For supply of hanger for bogie bolster suspension. drawing no.: icf drg. no. t-0-5-639, alt. g/11 mate rial specification: rdso's str no. c-k105 (rev. 1 of july 2014). [ warranty period: 30 months after th e date of delivery ]
Tender For construction of horizontal extension of ms hall (g plus 2) and snig hall (g plus 3)subwork/packages:(sh : supply, installation, testing and commissioning of cctv system in cpwd office at gandhi maidan, iit campus, kharagpur.)
Tender For supply of anti roll bar fork drawing no. : rcf's drg. no. 1267514, alt.-00r3. matl.& specn : mdts- 150, rev.-nil and mdst-155, rev.-nil . [ warranty period: 30 months after the date of delivery ]
Tender For supply of fabricated hand brake wheel (side operated) for boxn wagon. drawing no. : rdsos sk no. 78525, alt. nil. material and specification : is: 2062 : 2011(rev. 7), amend. no.1 of nov. 2012, gr. e 250a . [ warranty period: 30 months after the date of delivery ]
Tender For supply of aluminum ferrule o/d- 12mm, length - 55mm, specn - is:2678, as per kgp drg no.2028 [ w arranty period: 30 months after the date of delivery ]
Tender For supply of poh kit-2 for mk-50 high capacity draft gear consisting of 6 items. drawing no: as per k it details material and specification: as per drawing/part no. and conforming to rdso's spec. no. 49-b d-08 with amend. no. 1 of sept. 2016. [ warranty period: 30 months after the date of delivery ]