Get complete information related to latest Kharagpur Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Kharagpur Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Kharagpur Tenders.
Tender For supply of mpcb for water pump mbs 25 with aux. contact (1 no+1 nc) and terminal block db, current rating: 1.6a, thermal release range: 1-1.6a, voltage rating: 415v, class 10, breaking capacity: 50ka, pole: 3. [ warranty period: 30 months after the date of delivery ]
Tender For supply of must change kit for fiba, make- topgrip, tic part no.tg/fb/5253, as per annexure-b attached, part kit tic/5152 [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of arctic paragon grease. matl.& specn: bharat univex-cd or similar. [ warranty period: 30 months after the date of delivery ]
Tender For supply of double inlet (type-i) centrifugal blower assembly as per rcf spec. no. edts 331, rev 'a'or latest, 415 v, 3ph, 50hz. [ warranty period: 30 months after the date of delivery ]
Tender For supply of control arm assembly left consisting of 2 items. drawing no. : (i) control arm upper to rcf's drg. no.- 1277122, version-01r3, qty.-1 no., and (ii) control arm lower left to fiat -sig- schienenfahrzeuge ag's drg. no.-1267716, version -00r2, qty.- 01 no. material & specification: t.s. 17.334 100 06, t.s. 17.334 107 01, mdts-166, rev.- 02 or latest, mdts-241, rev.-02, is: 1865-1991, reaffirmed 2005, sg 400/18 l. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of 25mm x 2 mm bare copper strips as per is 1897:2008 or latest. [ warranty period: 30 months after the date of delivery ]
Tender For supply of copper cable, 35 sq mm, single core stranded annealed tin coated e-beam irradiated cross linked polyolefin insulated cable suitable for 1.8/3 kv grade, as per rdso's spec. no. elrs/spec/elc/0019, rev %u20184%u2019 of february 2018. [ warranty period: 30 months after the date of delivery ]