Tender For corrigendum : supply of leather bellow with mounting arrangement and hardware in a set for wag-9hc to clwdrg. no: - 1209-01.018-024 alt-1, category no. s/9/0062. [set means loco set consisting of 11 (eleven) items as per set details attached. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : supply of hardware items - forged hexagonal head bolt with nut spring washer and two plain washers. , austenitic stainless steel hex head bolts, heavy hex nuts, and washers for cryogenic pressure vessel/flange bolting, per asme sa-320/astm a320 for low-temperature service. , carbon steel fasteners
Tender For supply and installation of 3-seater complete for 1st class (double) to drg.no.icf/mrvc/c/bt(573)-6-1-002,col-i, alt-b. required cushion and upholstery material will be supplied by icf as free supply. all necessary hardwares required for installation is under the scope of supplier. please visit icf vendor portal for downloading drawing https://vp.icf.gov.in/vendtendordetnew.php using key:07266grwovq2204 [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply and installation of coach set of seats and berths for lscn/bw2 coach to drawing lscn/bw2(753)-6-1-001, alt -d, col-01 (except item 25,26,27 and respective hardware for fitting) cushioning material shall be pu foam as per rdso specification no.rdso/2007/cg04, rev-01 or latest and upholstery to rdso spec.rdso/2008/cg-07 ,rev-01 or latest. installation required as per arrangement drawing. all necessary hardwares required for installation is under scope of the supplier. note: firm has the option for offering seats and berths cushion with lower density of 65 plus or minus 5 kg/m3 conforming to spec.rdso/2007/cg-04, rev-01 or latest also. please visit icf vendor portal for downloading drawing https://vp.icf.gov.in/vendtendordetnew.php using key:0726ob8qu4v2382 [ warrantyperiod: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of one set of hardware for mounting of cbc coupler. (list of items enclosed in annexure a ) [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of hardware consisting of one hex head bolt m14x90 full threaded grade 8.8 as per is: 1364/2002along with one nut as per is-1363/67, 02 nos. plain washers as per is-2016 & one spring washer as per is-3063/72. all items galvanized (for mvmt & mvrh). " [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of aluminium components for acp roof ceiling arrgt. for lhb slr amrit bharat 3.0 coaches. intrior colour scheme as per design l. no. md48161 dated 15.05.2026., as per drawing: mplalclslrdab version 0, packing instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be followed. (2) it should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of supplier. for underframes: both (1) & (2) to be followed as stated above. for other items except underframes: only (2) need to followed. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of return air duct complete for ac 3t amrit bharat coaches. follow colour scheme as per design l.no. md48161 dated 15.05.2026., as per drawing: mplrad3tab version 0, packing instruction: frp ceiling sheet/side wall panels/frp component self adhesive biodegradable plastic lamination sheet to be provided on each component. projected metallic parts to be protected with plastic/nylon/frpcaps/proper wrapping of biodegradable bubble sheet from all the sides. each component to be packed in biodegradable bubble sheet all around with proper tapping & then to be placed in cardboard box followed by 3 nylon strips tightened from both sides. then collective packs of components to be packed in wooden cage made from wooden strips of size 100x20mm & gap between each strip should not be more than 100mm.on the wooden crate base 3 wooden pegs of size100x100mm (along the length) to be provided for ease in handling with fork lifter.all loose items of a set to be packed separately in cardboard box with list of loose items pasted on each box and collective packs of item to be packed in wooden cage made from wooden . roof ceiling (having curved surfaces) in addition to above packing should be stacked on a metallic frames before packing in the wooden boxes. one package should not contain material belonging to more than one coach set & grouping should bepreferably of similar sizes. also packing should have indication like 1/4,2/4 etc. ( e.g. four packings will make one coach set) so that one complete coach set can be easlyidentified. the maximum weight of the wooden crate should not be more than 200 kgs. alist should be pasted on each wooden crate showing order no, pl no. description of item,drg no/spec no/set list no. with version, qty, firm's name & address,date of despatch etc. [ warranty period: 84 months after the date of delivery ] ]