Web Analytics Made Easy - StatCounter

Modern Coach Factory Raebareli Tenders - MCFR Tenders

Get complete information related to latest Modern Coach Factory Raebareli Tenders - MCFR Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Modern Coach Factory Raebareli Tenders - MCFR Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Modern Coach Factory Raebareli Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45731582 Due date: 03 Jul, 202603 Jul, 2026 NA
Tender For supply of siemens make sinamics cu 230p mlfb: 6sl3243-0bb30-1fa0 [ warranty period: 12 months after the date of delivery ] ]

CTN :45731252 Due date: 08 Jul, 202608 Jul, 2026 NA
Tender For supply of set of lugs of various types (set list as per annexure-a). [ warranty period: 30 months after the date of delivery ] ]

CTN :45337692 Due date: 10 Jul, 202610 Jul, 2026 NA
Tender For corrigendum : supply, installation, commissioning and proving out of fire worthiness test module (total 7 items) as per attached specification section -i and -ii [ warranty period: 30 months after the date of delivery ] ]

CTN :45731580 Due date: 03 Jul, 202603 Jul, 2026 NA
Tender For supply of support bracket complete as per drg.no. le63243, packing instruction - pi004 [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

CTN :45731640 Due date: 06 Jul, 202606 Jul, 2026 NA
Tender For supply of inspection door in driver's cab back partition for memu 3 phase medha coaches, as per drawing no.: 74590028 (item no. 25 of drg no 74590020 alt-b) , colour scheme shall be applicable as per rcf letter md22151 dated 29.11.2022. packing instruction no. pi042 ver 1.0. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]

CTN :45731253 Due date: 08 Jul, 202608 Jul, 2026 NA
Tender For supply of wall mount fan as per is 555, 400 mm sweep, operating on 220-240 v single phase ac, 50 hz [ warranty period: 24 months after the date of delivery ] ]

CTN :45730419 Due date: 20 Jul, 202620 Jul, 2026 NA
Tender For work contract of interior - exterior, mechanical and electrical "furnishings & fittings including interior & exterior plumbing fittings and additional water filling arrangement / activities with coach lowering" in lwscn lhb type coaches and mechanical and electrical "furnishings & fittings including interior & exterior, plumbing fittings / activities with coach lowering in lws/ddg lhb type coaches as per scope of work as per scope of work.

CTN :45454084 Due date: 07 Jul, 202607 Jul, 2026 NA
Tender For corrigendum : supply of inter-coach gangway without flexible interior system furnishing (including vestibule foot plate) forlhb coaches. gangway material must comply with the fire properties as specified in en 45545 hl-3. installation & commissioning: inclusive, as per mdts-22266 rev-01, packing instruction: pi091 ver. - 3.0. [ warranty period: 60 months after the date of delivery ] ]

CTN :45732078 Due date: 08 Jul, 202608 Jul, 2026 NA
Tender For supply of bush for disc brake for train 18 to drg. aaa32073 item 1 alt a." suitable packing to be done to avoid damage during transit, unloading and rust prevention duringstorage. [ warranty period: 30 months after the date of delivery ] ]

CTN :45737627 Due date: 30 Jul, 202630 Jul, 2026 NA
Tender For supply of copper coated co2 welding filler solid wire size 1.2 mm, as per spec. no. irs: m-46/2020 class-1, spool size & condition of wire as per is: 6419-96 (reaffirmed 2021 ) with additional requirement of precision lair winding (plw) & copper content of coating to be between 0.2 to 0.5%, weld test as per aws (sfa-5.18) section-ii part-c, cast-305 mm min. & helix 25 mm max. in spool of dia-300 mm & weight: 12.5 kgs, shelf life of material not to be less than one year from the date of manufacturing. quality plan - n.a [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
 Loading, Please wait...

Connect us via What's Up