Tender For set of hand rail for lhb slr amrit bharat coaches., as per drawing: mcfmplhrlslrabx version 00 , pl no.33695817 packing instruction - pi042 ver.-1.0,prototype sample shall beapproved before bulk supply. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of copper coated co2 welding filler solid wire size 1.2 mm, as per spec. no. irs: m-46/2020 class-1, spool size & condition of wire as per is: 6419-96 (reaffirmed 2021 ) with additional requirement of precision lair winding (plw) & copper content of coating to be between 0.2 to 0.5%, weld test as per aws (sfa-5.18) section-ii part-c, cast-305 mm min. & helix 25 mm max. in spool of dia-300 mm & weight: 12.5 kgs, shelf life of material not to be less than one year from the date of manufacturing. quality plan - n.a [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : supply, installation, commissioning and proving out of fire worthiness test module (total 7 items) as per attached specification section -i and -ii [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of inter-coach gangway without flexible interior system furnishing (including vestibule foot plate) forlhb coaches. gangway material must comply with the fire properties as specified in en 45545 hl-3. installation & commissioning: inclusive, as per mdts-22266 rev-01, packing instruction: pi091 ver. - 3.0. [ warranty period: 60 months after the date of delivery ] ]
Tender For supply, installation and commissioning of computerized vertical profile projector for cmt labas per attached specification no.-mcf/rbl/m&c/cvpp/2023 [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of hex head screw m24x100 high tensile as per drg.no. is: 1364 (part-2)-2023, ce- with property class-10.9 to is:1367 (part-3): 2017, coating as per mdts-057, packing instructions- pi042 ver.- 01 [ warranty period: 30 months after the date of delivery ] ]