Tender For removal of spilled over coal, fine dust and wet coal at tail end head end along the bcn-7a/b, 6a/b head end, gallery, bunkers floor and tp-5 area by head loads on to running conveyor from 01.12.2025 or actual date of commencement of work to 31.03.2026.
Tender For corrigendum : ktps vii stage-adm-ss-gs-annual maintenance contract (amc) for passenger lift (lk 3660) of ktps vii stage guest house for the period 01.10.2025 or from the date of issue of purchase order to the period of one year
Tender For corrigendum : ktps vii stage-adm-safety-spf-providing of one no.jeep on hire basis @24 hrs/day,including fixed charges with a milage up to 3000km/month for patrolling of ash pond areas by the spf personnel for the fy 2025-26 under the control of asst. commandant/spf/ktps vii stage for the period from 01.11.2025 (or) from actual date of commencement to 31.03.2026.
Tender For nshes - design, manufacture, supply, inspection and testing at manufacturers site before dispatch, delivery, dismantling of existing battery banks, installation, testing and commissioning of 1 no. 220v (110 x 2v), 535ah plante type lead acid battery bank and 13 nos. 2v, 860 ah plante type lead acid batteries at nshes, nagarjuna sagar.
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at bcn-3ab tunnel, fg floor at tp-2, ground portal, gallery and head end areas and contingency-1 and 2 area of 3ab including fg floors and reclaim belt conveyors and reclaim chain feeders by head loads on to running conveyor required in mm/chp/btps from 01.12.2025 or actual date of commencement of work to 31.03.2026.
Tender For removal of spilled over coal fine dust and wet coal at tail end, head end, along the bcn 4a/b, 5a/b, bcn-10, tp-3, tp-4, 6a/b tail end and erh area by head loads on to running conveyor from 01.12.2025 or actual date of utilization to 31.03.2026 required in mm-iii sub division of mm/chp/btps.
Tender For btps - chp - removal of spilled over coal, fine dust and wet coal at apron feeder floor and bcn-2ab tunnel including fg floors by head loads on to running conveyor from 01.12.2025 or actual date of commencement of work to 31.03.2026 required in mm-i sub division of mm/chp/btps.