Tender For labour charge for removal/transportation of silt, mud and water algae from cooling tower, cw pump house, clarifier & miscellaneous sump unit # 6 at utps. (civil ph)
Tender For bid to ras supply of mcc panel which includes the equipments below , incomer , outgoing 37. 5 kw 50 hp start or delta starter feeder for 3 nos 50 hp chiller package , outgoing 2. 2 kw dol starter feeder for cooling tower motor , outgoing 5. 5 kw dol feeder for condenser pump , outgoing 3. 7 kw dol feeder for chiller pump , power cable for chiller package , power cable for 4 nos chilled water pump dol starter , power cable for 4 nos condenser water pump dol starter , power cable for 3 nos cooling tower motor dol starter , internal wiring and ferrules , earthing , accessories for complete project , dismantling of existing unit and installation, testing and commissioning of mcc panel
Tender For corrigendum : supply of chemicals for stp water treatment in cooling tower water (ctw), including real time monitoring, automated dosing system to maintain guaranteed performance parameter of ctw along with o&m at 2x250mw bltps, padva, dist. bhavnagar.
Tender For corrigendum : uniform water flow distribution by through cleaning of splash nozzle distribution pipe of ndct unit ii at rgtpp, khedar, hisar - uniform water flow distribution in the cooling tower unit-ii by through cleaning of splash nozzle and distribution pipe at rgtpp, khedar
Tender For bid to ras providing of custom bid for services - rprc256022 replacement of cooling water line from cooling tower 2 to dhds unit at panipat refinery and petrochemical complex
Tender For labour charge for removal/transportation of silt, mud and water algae from cooling tower, cw pump house, clarifier & miscellaneous sump unit # 6 at utps
Tender For bid to ras supply of set of spares for pct of cob10 -complete set of cooling tower pvc fills, drifteliminators, nozzles and all alliedspares (excluding id fan and its drive assembly) for refurbishing each cell of primarycooling tower of cob #10. details of each cell of cooling tower- water inlet flow350-400 m3/hr, water inlet temp- 55 deg c, water outlet temp- 4 deg c above wet bulbtemperature. application of supplied material. other details as per annexurecob10/pct/fills/001.