Web Analytics Made Easy - StatCounter

Electrical Grid Repair Tenders

Get complete information related to latest Electrical Grid Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Electrical Grid Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Electrical Grid Repair Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :42484598 Due date: 23 Dec, 202523 Dec, 2025 83.99 Crore
Tender For corrigendum : work-a- establishing 2x20mva, 110/11kv sub-station at nagenahalli (gudiobalapura) and construction of 110kv lilo line using lynx conductor from existing 110kv munirabad power house-sankalapura sc line to proposed 110/11kv nagenahalli (gudiobalapura) sub-station for a distance of 1.314km in hosapete taluk, vijayanagara district,work b- establishing 2x20mva, 110/11kv sub-station at hosapete city (beside dc office-amaravathi) and construction of 110kv dc lilo line on 220kv mc towers using lynx conductor from existing 110kv munirabad power house-donimalai dc line to proposed 110/11kv sub-station at hosapete city (beside dc office-amaravathi) for a distance of 0.815km in hosapete taluk, vijayanagara district, work c-up-gradation of 33/11kv dothihal sub-station to 1x20mva, 110/33kv and 2x20 mva, 110/11kv sub-station at dothihal village and construction of 110 kv lilo line using lynx conductor from 110kv kushtagi-ilkal line-1 to proposed 110/33/11 kv sub-station at dothihal village for a distance of 5.775km in kushtagi taluk, koppal district, work d- establishing 2x20mva, 110/11kv sub-station at nelogipura(bhairapura) and construction of 110kv lilo line on dc towers using lynx conductor from existing 110kv mundaragi-betagera sc line to proposed 110/11kv substation at nelogipura (bhairapura) village for a distance of 5.693km in koppal taluk and district on partial turnkey basis including supply of all materials/equipments (excluding supply of 11kv switchgear),erection (including dismantling and civil works) of all materials/ equipments, testing and commissioning

State Government

CTN :42780080 Due date: 20 Dec, 202520 Dec, 2025 301.71 Crore
Tender For corrigendum : part-a- establishing 2x150 mva, 2x31.5 mva, 220/66/11kv sub-station at adinarayana hosahalli phase-ii industrial area at doddaballapura taluk, bengaluru rural district, part-b- running of 220kv dc 1200sqmm xlpe copper ug cable from 220/66kv doddaballapura (nrs) station to proposed 220kv cable terminating tower near adinarayana hosahalli phase-2 i/a entry point for distance of 5.435 kms., part-c- construction of 220kv transmission line using dc & mc design based monopoles from i/a entry point (proposed 220kv ctt) and from proposed 400/220kv adinarayana hosahalli i.a. s/s to proposed 220/66/11kv adinarayana hosahalli phase-2 kiadb s/s for a distance of 4.053 kms using aaac moose conductor, part-d- construction of 2 numbers of 220kv outdoor gis terminal bays at existing 220/66kv nrs doddaballapura station, part-e- construction of 2 numbers of 220kv indoor gis terminal bays at proposed 400/220kv adinarayana hosahalli station, part-f- 66kv lilo arrangement of existing 66kv nrs doddaballapura - vijayapura sc line to proposed 220/66/11kv adinarayana hosahalli phase - 2 kiadb sub-station under self execution basis by kiadb

State Government

CTN :42921022 Due date: 23 Dec, 202523 Dec, 2025 54.24 Crore
Tender For corrigendum : combined package of work a - establishing 2x20mva, 66/11kv sub-station at kodaganuru(kabburu) and construction of 66kv lilo line from existing 66kv davanagere-chitradurga sc line-2 tapped to 66/11kv mayakonda sub-station to proposed 66/11kv kodaganuru (kabburu) sub-station for a distance of 8.315km with coyote conductor in davanagere taluk & district, work b- establishing 2x20mva, 66/11kv sub-station at hirekogaluru and construction of 66kv lilo line from existing 66kv davanagere-kukkuwada-lingadahalli dc line to the proposed 66/11kv hirekogalur sub-station for a distance of 8.37km with coyote conductor in channagiri taluk, davanagere district, work c- establishing 2x20mva, 66/11kv sub-station at talya and construction of 66kv lilo line from existing 66kv chitrahalli-hd pura dc line to the proposed 66/11kv sub-station at talya using coyote conductor for a distance of 3.777km in holalkere taluk, davanagere district,on partial turnkey basis including supply of all materials/equipments (excluding supply of 11kv switchgear),erection (including dismantling and civil works) of all materials/equipments, testing and commissioning

State Government

CTN :42923879 Due date: 30 Dec, 202530 Dec, 2025 204.04 Crore
Tender For corrigendum : combined package of work-a-est 2x160mva, 220/110kv & 1x10mva, 110/11kv s/s at baidoddi (arasigera) and construction of associated transmission lines for a distance of 220kv - 2.925km and 110kv -90.901km along with terminal bays in raichur taluk & district.work-b-establishing 2x20mva, 110/11kv s/s at ashapur road and construction of 110kv lilo line for a distance of 3.115km in raichur taluk, raichur district.work-c-establishing 2x20mva, 110/11kv s/s at pamanakallur and construction of 110kv lilo line for a distance of 0.05km in maski taluk, raichur district.work-d-establishing 2x20mva, 110/11kv s/s at kyadigera and construction of 110kv lilo line for a distance of 7.989km in devadurga taluk, raichur district.work-e-establishing 2x20mva, 110/11kv s/s at amdihal and construction of 110 kv lilo line for a distance of 6.64km in lingasugur taluk, raichur district.work-f-establishing 2x20mva, 110/11kv s/s at halapura (joladarasi) and construction of 110kv lilo line for a distance of 9.39km in maski taluk, raichur district.

State Government

CTN :42937877 Due date: 24 Dec, 202524 Dec, 2025 108.12 Crore
Tender For corrigendum : combined package of the following work a- establishing 2x20 mva, 110/11kv sub-station at revaggi and construction of 110kv sc line using panther conductor from existing 110/33/11kv mahagaon sub-station to proposed 110/11kv revaggi sub-station for a distance of about 23.433km along with construction of 01 no. of 110kv terminal bay at 110/33/11kv mahagaon sub-station in kamalapura taluk, kalaburagi district. work b- establishing 2x20mva, 110/11kv sub-station at azadpur(hagarga) village and construction of 110kv lilo line using lynx conductor from 110kv kapanoor-gulbarga(north) sc line to the proposed 110/11kv azadpur(hagaraga) village sub-station for a distance of 9.499km in kalaburagi taluk & kalaburagi district work c- establishing 2x20 mva, 110/11kv sub-station at yagapur (belagera) village and construction of 110kv lilo line with lynx conductor from existing 110kv sc nalwar-yadgir (north) sc line to proposed 110/11kv sub-station at yagapur (belagera) village for a distance of 15.68km in chittapura taluk, kalaburagi district.work d- establishing 2x20mva, 110/11kv sub-station at tavaragera (keroor) village along with construction of 110kv lilo line using lynx conductor from existing 110kv kapnoor-humnabad-i line to proposed 110/11kv sub-station at tavaragera (keroor) village for a distance of 5.754km in kalalburagi taluk, kalaburagi district. work e -establishing 2x20mva, 110/11 kv sub-station at pattan(hatagunda) village and construction of 110 kv lilo line using lynx conductor from existing 110kv kapnoor-madiyal line to proposed 110/11kv sub-sttaion at pattan(hatagunda) village for a distance of 0.370km in kalaburagi taluk and district on partial turnkey basis including supply of all materials/equipments (excluding supply of 11kv switchgear) and erection (including dismantling and civil works) of all materials/equipments, testing and commissioning.

corporations/Associations/Others

CTN :43169712 Due date: 26 Dec, 202526 Dec, 2025 27.23 Lacs
Tender For work of erection, testing and commissioning of 66kv lilo to kotda sangani from existing 66kv s/c padavla -hadamtala line partly on m/c tower with panther conductor and shifting of 66kv s/c piplana-kotda sangani line passing from proposed 220kv kotada sangani ss land having line length 0.350km approved under ksy-ii

CTN :43182178 Due date: 31 Dec, 202531 Dec, 2025 NA
Tender For stringing of htls conductor in 132kv katapali bargarh sc line and 132kv thuapali dc lilo line after dismantling of acsr panther conductor on turnkey contract basis in baragarh district

corporations/Associations/Others

CTN :43189264 Due date: 31 Dec, 202531 Dec, 2025 NA
Tender For conducting preliminary survey and detailed survey using gps including preparation of route map etc for making lilo of erode to pugalur 110kv sc line section between nadupalayam 110kv ss and kodumudi 110 kv ss at kurukkathi 230 110kv ss

corporations/Associations/Others

CTN :43199713 Due date: 31 Dec, 202531 Dec, 2025 NA
Tender For supply and erection of 110 kv dc line on dc towers and stringing of 6 nos panther conductor 1no earthwire for making lilo of the existing 110 kv ingur to kurukkathi ii feeder at the madavilagam 110 33 11 kv ss

State Government

CTN :43172142 Due date: 16 Dec, 202516 Dec, 2025 NA
Tender For checking & tightening of jumpers of 132kv paradeep-ppl dc line, paradeep ppt dc line, paradeep iffco dc line, paradeep rtss siju sc line, pattamundai kendrapara sc line olaver-chandabali dc line, jajpur road-kendrapara dc line, 132kv chandikhole lilo line, kendrapara-salipur sc line, paradeep-tirtol dc lilo line along with replacement of b-phase conductor from loc no. 14-15 of 132kv paradeep-iffco ckt-i, 132kv paradeep-ppl ckt-ii between location no. 01 to gantry and replacement of damaged insulator string of 132kv kendrapara-pattamundai sc line at loc no. 51 under eht (o&m) division, paradeep."
 Loading, Please wait...

Connect us via What's Up