Tender For corrigendum : 1establishing 2x100mva, 220/110kv and 1x10mva, 110/11kv sub-station at tekkalakote (konchigere) village in siruguppa taluk & ballari district, 2.construction of 2nos. of 220kv terminal bays at 220kv somasamudra sub-station for termination of 220kv tekkalakote dc line in ballari taluk & district,3.construction of 2nos. of 220kv terminal bays at 220kv sindhanur sub-station for termination of 220kv tekkalakote dc line in ballari taluk & district,4.construction of 220kv dc line with drake conductor from existing 220kv sindhanuru sub-station to the proposed 220/110/11kv sub-station for a distance of 39.853km at tekkalakote (konchigere) village in siruguppa taluk & ballari district,5.construction of 220kv dc line using drake conductor from existing 220kv somasamudra sub-station to the proposed 220/110/11kv sub-station for a distance of 20.034km at tekkalakote (konchigere) village in siruguppa taluk & ballari district,6.stringing of second circuit with lynx conductor on existing dc towers of 110kv kurugodu-siruguppa sc line to the existing 110/33/11kv siruguppa sub-station for a distance of 47.318km in siruguppa taluk & ballari district, 7.construction of 110kv dc lilo line using lynx conductor from existing 110kv kurugodu-siruguppa line & 110kv sirigeri cross-tekkalakote line to the proposed 220/110/11kv sub-station at tekkalakote (konchigere) village for a distance of 3.531km in siruguppa taluk & ballari district, 8.construction of 110kv lilo line from second circuit of 110kv kurugodu-siruguppa line to the existing 110/11kv sirigeri cross sub-station for a distance of 4.309km in siruguppa taluk & ballari district, 9.construction of additional circuit from lilo point of 110kv allipura-somasamudra line to the existing 110kv tap line for a distance of 1.094km in siruguppa taluk & ballari district,10.construction of 1no. of 110kv terminal bay at existing 110/11kv siruguppa sub-station for termination of 110kv second circuit on existing dc towers of 110kv tekkalakote-siruguppa sc line to the proposed 220/110/11kv tekkalakote sub-station in siruguppa taluk & ballari district,11.construction of 1no. of 110kv terminal bay at existing 110kv kurugodu sub-station for termination of 110kv 2nd circuit on existing dc towers from 110/11kv siruguppa sub-station to 110/33/11kv kurugodu sub-station in kurugodu taluk, ballari district,12.construction of two additional line terminal bays at 110kv sirigeri cross sub-station for the work of construction of second 110kv lilo line to 110kv sirigeri cross sub-station using lynx conductor from proposed second circuit of 110kv kurugod - siruguppa line in siruguppa taluk, ballari district,13.decommissioning works at 220kv somasamudra and 220kv sindhanur sub-stations,14.decommissioning works in 220kv sindhanuru-tekkalakote line, 110kv kurugodu-siruguppa line, 110kv dc lilo line of 110kv kurugodu-tekkalakote line, 110kv sirigeri cross & 110kv allipura-somasamudra line,on partial turnkey basis, including supply of all materials/equipments (excluding supply of 1x10mva,110/11kv power transformer & 11kv switchgear), erection (including dismantling and civil works) of all materials/equipments, testing and commissioning.
Tender For corrigendum : establishing 2x12.5 mva, 66/33kv and 1x12.5 mva, 66/11kv sub-station at katakeri along with construction of proposed 66kv lilo line from the existing 66kv madikeri-virajapete sc line on dc towers to proposed 66/11kv sub-station at katakeri for a distance of 4.765km in madikeri taluk, kodagu district on partial turnkey basis including supply of all materials/equipments (excluding supply of 1x12.5mva, 66/11kv power transformer and 11kv switchgear) and erection (including civil works) of all materials/equipments, testing and commissioning.
Tender For corrigendum : establishing 2x20 mva, 66/11kv sub-station at kembuthagere (amrutheshwaranahalli) in malavalli taluk, mandya district and construction of proposed 66kv lilo line (110kv towers) from existing 66kv tk halli-km doddi m1 line to the proposed 66/11kv kemboothgere (amrutheshwaranahalli) sub-station for a distance of 1.541kms in malavalli taluk, mandya district
Tender For work of replacement of silicone rubber insulator (sri) by silicon rubber insulator (sri) for multi circuit 220kv sarigam lilo line. (1) 220kv vapi-sarigam line, (2) 22kv sarigam tarapur line, (3) 220kv bhilad sarigam line -1 & (4) 220kv bhilad sarigam line -2.
Tender For erection work of 66kv lilo line to 66kv simli (segwa) sub-station from exi. 66kv sinor - sadhli line on d/c panther tower with acsr panther conductor having route length of 2.5 rkm approved under r&m plan 2025-26 under bodeli tr division of jambuva tr circle.
Tender For t-2634: establishment of 132/33kv substation at fulsawangi, dist: yavatmal alongwith lilo on one circuit of 132kv pusad - gunj line at proposed 132kv fulsawangi substation (route length- 27.8 km) on turnkey basis under amravati zone, msetcl, maharashtra.
Tender For erection work of 66kv lilo to proposed 66kv ghelwant sub-station from existing 66kv vasedi-simal faliya line with acsr panther conductor on d/c panther tower having line route length of 5.10 rkm under construction division jambuva..
Tender For corrigendum : combined package of the following workswork a establishing 1x20mva, 110/33kv and 2x20mva, 110/11kv substation at ahmedabad and construction of 110kv lilo line to proposed 110/11kv ahmedabad substation from existing 110kv halbarga santhpur line for a distance of about 0.237kms in bhalki taluk, bidar district. work b construction of 110kv lilo line to existing 110/11kv nirna substation from existing 110kv manna e khelli chincholli ine for a distance of 1.406kms and construction of 110kv terminal bays at existing 110/11kv nirna sub station for termination of proposed 110kv lilo line from existing 110kv manna e chincholi line in humnabad taluk, bidar district on partial turnkey basis including supply of all matching materials/equipments (excluding supply of 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning
Tender For stringing of 2nd circuit for making lilo arrangement of existing 66kv sc tap line on dc towers from existing 66kv holenarasipura-doddakadanuru dc line to the existing 66/11kv substation at mandegere for a distance of about 11.901 kms along with construction of 01 no. 66 kv terminal bay at existing mandagere 66/11 kv sub-station in k.r.pet taluk mandya district on total turn key (ttk) basis.