Tender For supply of centrifugal blower double inlet complete with fan motor (type-1), suitable forlhb type ac coaches as per rcf spec. no.edts-331, corr-3, amendment no.1,type-1. [ warranty period: 30 months after the date of delivery ]
Tender For repair supply installation and related strengthening work of electrical mechanical equipment - supply and fixing of beta make blower 1618 rpm capacity 403cum, supply and fixing of fine screen manual at inlet section (ms), supply and fixing of dg set 60kva, kirloskar make, supply and fixing of chlorine dosing pump mattito make, supply and fixing of star delta panel l&t make 10hp, supply and fixing of dg change over switch l&t make 400amp 25kva, supply and fixing of panel mcb l&t make 63 amp, supply and fixing of street light havells make 50w, supply and fixing of panels make l&t make 4x6 ft, supply and fixing of pump connection box l&t make 25amp, "supply of tool, grinder, spaner, hammer, wrench, screwdriver, pliers, ladder, hacksaw, mallet, adjustable wrench, showel, pickaxe etx, "supply of safety equipments gloves, mask, helmet, dungarees dress, dettol, soap, sanitizer, phenyl etc, decanting arrangement for both tanks of treated water 200mm ss pipes with pneumatic valves 200mm ms pipes laying, cutting, shifting and welding, pneumatic valve 200mm with automation, 200mm dia hole in both sbr tanks by mechanical means, 200mm dia flange cutting & welding work(with 8 hole with all consumable items), transportation charges, jcb rent for misc work, point blank hand held search light, type- led 30 watt , earthing in stp , installation of aeration grid in rcc tank 6.5m x 6.5m x 6m, wiring in stp room, cleaning of rcc tank & grass cutting etc, supply and fixing of kishor make centrifugal mono block pump set in bronze head 11mtr, discharge 2250 lpm with 10 hp motor 2900 rpm with frame, nut bolts etc., supply and fixing of dg set 25kva, kirloskar make, supply and fixing of star delta panel l&t make 10 hp, "supply and fixing of dg change over switch l&t make 400amp, 25 kva, supply and fixing of panel mcb l&t make 63 amp, supply and fixing of sluice valve jindal make size 100mm dia, supply and fixing of kirpo make chain pulley 01 tonne capacity and 4.5m long chain, supply and fixing of guard pipe jindal make, "supply of tool, grinder, spaner, hammer, wrench, screwdriver, pliers, ladder, hacksaw, mallet, adjustable wrench, showel, pickaxe etc, supply and fixing of street lights havells make 50w, supply and fixing of panels make l&t make size 4x6 ft, "supply of safety equipments gloves, mask, helmet, dungarees dress, dettol, soap, sanitizer, phenyl etc, supply and fixing of kishor make centrifugal mono block pump set in bronze head 11mtr, discharge 2250 lpm with 10 hp motor 2900 rpm with frame, nut bolts etc., supply and fixing of star delta panel l&t make 10 hp, supply and fixing of dg set 25kva, kirloskar make, "supply and fixing of dg change over switch l&t make 400amp, 25 kva, supply and fixing of panel mcb l&t make 63 amp, supply and fixing of kirpo make chain pulley 02 tonne capacity and 4.5m long chain, supply and fixing of guard pipe jindal make, supply and fixing of street lights havells make 50w, supply and fixing of panels make l&t make size 4x6 ft, supply and fixing of pump connection box l&t make 25 amp, "supply of tool, grinder, spaner, hammer, wrench, screwdriver, pliers, ladder, hacksaw, mallet, adjustable wrench, showel, pickaxe etc, "supply of safety equipments gloves, mask, helmet, dungarees dress, dettol, soap, sanitizer, phenyl etc for smooth operation of 1.25 mld stp sps1 and sps2 under bhimtal sewerage scheme
Tender For supply of 30 kw motor for oil cooling unit (centrifugal design) for 3 phase locomotives(wound with corona resistant wire)conforming to rdso specification no.e-10/3/09 (motor) with amendment no.1 to 6or latest and clw specification no. clw/es/3/0647, alt`e" or latest [ warranty period: 30 months after the date of delivery ]
Tender For centrifugal blower double inlet complete with fan motor. suitable for exhaust fan in lhbtype ac coaches, as per rcf spec. edts-331 rev-nil, corr 3, scope of supply type-1, double inlet. [warranty period: 30 months after the date of delivery ]
Tender For reparing and maintenance of various electro -mechanical parts for centrifugal motor pump set machinary at mangali pump house under division bundi.
Tender For repair and maintenance of wss sohari takoli phase-i (sh- repair of 30 hp induction motor jyoti make (2) repair and maintenance of wss sohari takoli phase-i (sh-repair of 30 hp, 5 stage centrifugal pump ksb make set no. 2)
Tender For repair and maintenance of lwss lohardi pathroti 2nd stage in tehsil pachhad distt. sirmour hp (sh:- repair of centrifugal pump make:- ksb,type:-wkfi 40/14 set no.01 coupled with 60 hp motor.
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f