Web Analytics Made Easy - StatCounter

Filter Dust Exhauster Motor Tenders

Get complete information related to latest Filter Dust Exhauster Motor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Filter Dust Exhauster Motor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Filter Dust Exhauster Motor Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :39213242 Due date: 13 Feb, 202513 Feb, 2025 NA
Tender For repair to starter (rotor controller) of slipring motor 150 hp at pumping station rathian.

State Government

CTN :39215619 Due date: 13 Feb, 202513 Feb, 2025 NA
Tender For restoration of ran damage of lwss logwalti bomson (pump house boru) in tehsil & distt. hamirpur (sh;- opening refitting and washing, varnishing of motor and repair of rotor starter, sluice valve etc.)

CTN :39198736 Due date: 21 Feb, 202521 Feb, 2025 8.21 Lacs
Tender For repair and rewinding of compressor ten tr capacity including flushing of ac unit, replacement of crank shaft piston with pin ring and suction and delivery plate oil pump rotor rewinding of ten hp motor gasket set with commission after repair of

CTN :39028007 Due date: 11 Feb, 202511 Feb, 2025 2.44 Crore
Tender For procurement of stp evac spares nozzle, rubber bend, valve solenoid, 1-1/2 in, nut,ss,elastic stop, m10x1.50,orca iia-165, fastening rod, wing nut, three way valve r 3/8", vacuum gauge, vacuum gauge r1/2" bar-1 0, seat and cover anaira, impeller 238mm/50hz), seal mechanical, o-ring 259,3x5,7 for pump evac se 044a, elbow joint 8/8, water valve evac 90, connection hose, pneumatic push button, pnematic push button, hose 4x2x1-1000, nipple, back plate evac 900 floor, outlet pipe, inside guiding for discharge valve dn 40, kit, plug complete, kit, repair complete, kit, repair complete, end-face seal product-end, nipple, galv., 1-1/2 npt x 1-3/4 in lg, clamp,1/4 in tube, nut, hex, 5/16 in., adaptor, screw, cap, 5/16 x 3/4 in. lg, flange, 2 in. outlet, bronze, flap non return for ejector, rubber plate, push button, mini check valve, clip, water valve, spare part kit for pump evac se 044a, mechanical seal kit, both, seat and cover, toscana, kit, gaskets complete, impeller, actuator 3/2, 1/8 ,220 ac, nipple, 3-way pneumatic valve, level switch, level switch, magnetic valve 3/4", pressure gauge, glycerine filled,0-6 bar, waste water flow adjustment valve, contractor, complete anode, kit diaphragm, kit, pump head, maintenance kit, kit valve, base plate, brushway filter, o ring 24x6 70nbr, countersunk screw m8x30 din 7991 -a2, rotor disc retaining washer, cyclone, multiple knife, multiple cutter, air pressure regulator, mechanical seal, lube puller (xi), o-ring p2-437 50sh 2"s lid nbr well lub, pressure dif. indicator, l-connector 1/4" mx6mm black - red, brush assembly 2"t, plastic brush unit (242mm) 2"t/8"b/a, o-ring no. 13, mechanical seal, bearing, 3 way valve r 1/2", seat and cover with hinges, hose 14x7x3,5, water valve, o-ring, shaft adaptor, o-ring 100,5x94,5x3 nbr70, kit, motor bearing complete, 2-way pneumatic valve, static mixer 3/4", plug, angular ball earing 3206 2rs co, rotary disc 100 mm, bellow, ball bearing 6004-2z, elbow (flushing ring), impeller, float, centrifugal pump, 3.25 in. dia impeller(50hz application), impeller, level switch, coil, diaphragm kit, plug, cable tray front 3, o-ring no. 15, impeller

State Government

CTN :38373215 Due date: 05 Feb, 202505 Feb, 2025 1.09 Lacs
Tender For corrigendum : scope of workscope of work: - (at firms workshop):-1. dismantling of pump and internal checking of pump to analyse the defects.2. checking of impeller, cleaning of impeller and other internal parts.3. checking of stator and rotor can, replacement of ss seamless cans.4. proper fitting of impeller and balancing of impeller.5. checking of stator and rotor windings, rewinding of the same as per requirement.6. checking of bearing, voltage coils, rewinding of coils with class #h# insulation.7. replacement of defective internal parts, components, such as bearings, sleeves, washers, etc.8. testing of motor pump and painting of the body.9. successful trial of pump.10. material & service guarantee shall be applicable for 12 months from the o/h of pump.11. rewound stator shall be tested for winding resistance and compared with original.12. winding resistance of individual phase should not have more than 2% deviation to other phases.13. ir value of motor shall be recorded, before and after completion. complete test report with type of instrument used to be submitted at the time of handing over of the motor.14. motor assembly should be carried out by contractor so that no any damage to overhang portion of winding happen otherwise contractor shall be responsible and will have to repair again.terms and conditions: -1. all man power, t&p, consumables etc. shall be arranged by the firm.2. the firm have to make his own arrangement for transportation of defective pumps from the site to firm's workshop. similarly, the repaired pumps shall be delivered to our site.3. completion period: 5 days for to and fro transportation and 10 days for repairing work. total 15 days.4. payment term: 100 % payment shall be made within 45 days after completion of work satisfactorily on actual work done basis.5. contractual period: 18 months.6. the firm shall submit the gst invoice for payment of service through ra bill. however, release of bills of work as well as supply, the repaired / serviced pumps shall be run on trial for at least 01 hours continuously.7. penalty: penalty will be imposed @rs.1000/-per day or part thereof due to delay in work but limit to 10 % of order value if delay in completing the work.8. in the case of work at site/ plant premises.9. all safety precautions & safety rules shall be followed by the contractor, also necessary safety appliances like gloves, masks, helmet, shoes etc. shall be available to their labour during execution of work.10. if any labour of contractor meets with an accident because of not using the safety appliances, in such cases, if any fine/penalty is imposed on the occupier/factory manager of the power station, than the payment of amount of such fine/penalty or all legal compliance shall be meet out by the contractor.se (turbine)1x500 mw, cspgcl, kwb

CTN :38920817 Due date: 11 Feb, 202511 Feb, 2025 40.00 Lacs
Tender For tender for water supply electrical equipment and machinery repairing work year 2025 at municipal council narmadapuram mp (please furnish the rate with gst) - water supply electrical equipment and machinery repairing -, 50 hp submersible motor pump - binding and repair, 35 hp submersible motor pump - binding and repair, 27.5 hp submersible motor pump - binding and repair, 25 hp submersible motor pump - binding and repair, 22.5 hp submersible motor pump - binding and repair, 20 hp submersible motor pump - binding and repair, 17.5 hp submersible motor pump - binding and repair, 15 hp submersible motor pump - binding and repair, 12.5 hp submersible motor pump - binding and repair, 10 hp submersible motor pump - binding and repair, 7.5 hp submersible motor pump - binding and repair, 5 hp submersible motor pump - binding and repair, 2 hp b-4 motor pump - binding and repair, 1 hp b-4 motor pump - binding and repair, 20 hp mono block - binding and repair, changing - submersible motor/pump upper 4", changing - submersible motor/pump upper 6", changing - submersible motor/pump upper 8", changing - submersible motor/pump lower 4", changing - submersible motor/pump lower 6", changing - submersible motor/pump lower 8", changing - submersible motor/pump thrust bearing carbon 4", changing - submersible motor/pump thrust bearing carbon 6", changing - submersible motor/pump thrust bearing carbon 8", changing - submersible motor/pump - base - 4", changing - submersible motor/pump - base - 6", changing - submersible motor/pump - base - 8", changing - submersible motor/pump - lower motor flange - 4", changing - submersible motor/pump - lower motor flange - 6", changing - submersible motor/pump - lower motor flange - 8", changing - submersible motor/pump - upper motor flange - 4", changing - submersible motor/pump - upper motor flange - 6", changing - submersible motor/pump - upper motor flange - 8", changing - submersible motor/pump thrust bearing bush 4", changing - submersible motor/pump thrust bearing bush 6", changing - submersible motor/pump thrust bearing bush 8", changing - submersible motor/pump - sealing ring 4", changing - submersible motor/pump - sealing ring 6", changing - submersible motor/pump - sealing ring 8", changing - submersible motor/pump motor bearing bush 4", changing - submersible motor/pump motor bearing bush 6", changing - submersible motor/pump motor bearing bush 8", changing - submersible motor/pump rotor sleeve 4", changing - submersible motor/pump rotor sleeve 6", changing - submersible motor/pump rotor sleeve 8", changing - submersible motor/pump motor coupling 4", changing - submersible motor/pump motor coupling 6", changing - submersible motor/pump motor coupling 8", changing - submersible motor/pump stage nut 4", changing - submersible motor/pump stage nut 6", changing - submersible motor/pump stage nut 8", changing - submersible motor/pump motor key 4", changing - submersible motor/pump motor key 6", changing - submersible motor/pump motor key 8", changing - submersible motor/pump housing bush fitting 4", changing - submersible motor/pump housing bush fitting 6", changing - submersible motor/pump housing bush fitting 8", changing - submersible motor/pump housing bush rubber 4", changing - submersible motor/pump housing bush rubber 6", changing - submersible motor/pump housing bush rubber 8", changing - submersible motor/pump motor servicing 4", changing - submersible motor/pump motor servicing 6", changing - submersible motor/pump motor servicing 8", 20 hp - mono block motor - bearing, 20 hp - mono block motor - bearing plate, 20 hp - mono block motor - pump bearing, 20 hp - mono block motor - soft bearing, 20 hp - mono block motor - soft bush, 20 hp - mono block motor - bearing sheet, glen dori, sir clip 4", sir clip 6", sir clip 8", filling plug 4", filling plug 6", filling plug 8", thrust bearing housing 4", thrust bearing housing 6", thrust bearing housing 8", base plate 4", base plate 6", base plate 8", mot
 Loading, Please wait...

Connect us via What's Up