Web Analytics Made Easy - StatCounter

Flashback Arrestor Tenders

Get complete information related to latest Flashback Arrestor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Flashback Arrestor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Flashback Arrestor Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :39670810 Due date: 31 Mar, 202531 Mar, 2025 NA
Tender For corrigendum : supply of mini rail , coolant filter element , sensor ring big , sensor cable , flash back arrester heating oxygen , matching setting , flashback arrestor lpg

State Government

CTN :39106167 Due date: 03 Apr, 202503 Apr, 2025 NA
Tender For corrigendum : tggenco-ktps-vii stage-tm-procurement of spares and pneumatic valve and actuators for cpu regeneration system

Central Government/Public Sector

CTN :39722377 Due date: 05 Apr, 202505 Apr, 2025 NA
Tender For tender for supply of tender forspare for pneumatic valve actuators

Central Government/Public Sector

CTN :39641467 Due date: 31 Mar, 202531 Mar, 2025 1.93 Lacs
Tender For custom bid for services - yearly routine of fm 200 system-e-065: - yearly routines are falling due on fm-200 system of this unit. |routines to be carried out as per maintenance schedule and system to be proved for satisfactory operation. following jobs to be carried out as part of the routines: () after removal of solenoid valve from fm-200 cylinder head of the system, the following checks need to be carried out: electric remote cabinet opening |from remote and pneumatic release cabinets. () systems check- checks each electrical manual release unit for operation. (ii) check fire alarm and evacuation alarm lights and sounds. (iv) check that all ac are shut down or dampers are closed, if any. (v) check that all pneumatic actuator operates after pre-set time delay. (vii) check operation of discharge pressure switch and check indicator lamp. (viii) reset all pneumatic actuator, electrical actuators, discharge pressure switch and fire alarm system. (ix) pipe work/ nozzle to ensure that they are free from debris. (x) check dust caps are fitted. (xi) containers - check containers are safe mechanical damage, corrosion or unauthorized interference. (xi) check containers brackets are fitted and all bolts tightened. (xii) chek pneumatic actuation tubing is firmly fixed and all connections are |tight..
 Loading, Please wait...

Connect us via What's Up