Web Analytics Made Easy - StatCounter

Rcc Tunnel Tenders

Get complete information related to latest Rcc Tunnel Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rcc Tunnel Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rcc Tunnel Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39157483 Due date: 24 Feb, 202524 Feb, 2025 NA
Tender For [i] ohe modification required for construction of track machine siding at dbl station length of 420m [ii]sbc-tk-spgr section: ohe modifications in connection with proposed pedestrian subway at old shettyhalli gate km 67/700-800 near shettyhalli.[iii]sbc-tk-spgr section: ohe modifications in connection with proposed construction of rub @ rly km 81/500-600 in lieu of lc no.48.[iv]sbc-tk-spgr section: ohe modifications in connection with proposed construction of rub @ rly km 85/700-800 in lieu of lc no.50.[v]ohe modifications in connection with engineering track works in ypr-spgr section.

Corporations / Associations / Others

CTN :39199199 Due date: 06 Feb, 202506 Feb, 2025 6.87 Lacs
Tender For repairs and improvements works to shopping complex in pedestrian subway at kamarajar salai in division-114, unit-27,z-9

CTN :39204343 Due date: 11 Feb, 202511 Feb, 2025 17.86 Lacs
Tender For various petty works to be carried out such as providing granites railing etc and other minor repairs to pedestrian subway near best depot at s.v. road andheri w in kwest ward

Central Government/Public Sector

CTN :39128528 Due date: 25 Feb, 202525 Feb, 2025 NA
Tender For hubballi division: hubballi-londa (ubl-ld) section: construction of pedestrian subway [5.0 x 3.2m] at km 486/600 in between navalur-dharwad (nvu-dwr) station. (maintenance period=04 months)

CTN :39088418 Due date: 13 Feb, 202513 Feb, 2025 NA
Tender For s&t work in connection with:- (a) mldt division tph-rjl sl trr(p)= 1.29 km & trrp bgp-jmp up 305.112-305.621 = 0.509 km, (b) tinpahar - rajmahal (sl) - tsr(p) - 3.000 tkm, (c) tfr- sl 97.4-114.37=18.97 km in section of mdle-dumka and trr(p) 0.580km in section of bhle-baka, (d) new farakka - malda (up & dn) - tsr(p) - 4.252 tkm, (e) new farakka - malda town (dn) - trr(p) - 0.500 tkm, (f) malda division - ctr(s) - 51.750 tkm, (g) malda division - trr(s) -14.976 tkm, (h) jamalpur - kiul - tftr - 1.800 tkm & bhagalpur - jamalpur - tftr - 0.900 tkm, (i) barharwa - karanpurato - ttr(fs+tws+wcmsc) - 6 sets (1:12), (j) bhagalpur - kiul (dn) - ctr(p) - 1.331 tkm, (k) azimganj - new farakka (dn) - ctr(p) - 25.284 tkm, (l) azimganj - new farakka - ttr(cs+cmsc) - 24 sets (1:12) & ttr(fs+cs+cmsc) - 10 sets (1:12), (m) azimganj - new farakka (up) - ctr(p) - 27.871 tkm, (n) construction of subway in leau of lc gate no 42 at km 239/7-8 bet stn nile-dgle in nfk-az section of malda division, (o) construction of subway in leau of lc gate no 61 at km 260/6-7 bet stn tdle-bdag in nfk-bhw section of malda division., (p) construction of subway in leau of lc gate no 41 at km 238/6-7 bet stn nile-dgle in nfk-az section of malda division, (q) jamalpur - development of infrastructure for newly allotted 140 ton diesel hydraulic brake-down crane (b.d. crane) at jamalpur, (r) construction of lhs at km 262/2-3 between cmx-nfk station in mldt-nfk section, (s) construction of pedestrian subway at km 250/6-7 in connection with rising of sectional speed to 130 kmph under aen/sbg, (t) construction of pedestrian subway at km 272/1-2 in connection with rising of sectional speed to 130 kmph under aen/mldt., (u) provision of trd central store at malda

Central Government/Public Sector

CTN :38791363 Due date: 20 Feb, 202520 Feb, 2025 NA
Tender For corrigendum : appointment of general consultant (gc) for the works of elimination of level crossing gates in different divisions of central railway under cao/c/rsp in central railway by construction of rob/ rub/ lhs/fob/pedestrian subway/other structures/road merger/diversion etc from the stage of review of dpr to execution & commissioning and hand holding till defect liability period (dlp) of execution contract, excluding execution supervision.
 Loading, Please wait...

Connect us via What's Up