Web Analytics Made Easy - StatCounter

Rcc Tunnel Tenders

Get complete information related to latest Rcc Tunnel Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rcc Tunnel Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rcc Tunnel Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :43167740 Due date: 16 Jan, 202616 Jan, 2026 4.93 Crore
Tender For corrigendum : diva aagasan datiwali railway crossing proposed laying of 1000 mm dia rcc casing pipe for carrying 400 mm dia and 500 mm dia ms water carrier pipe across under the railway track between es no 43 45 43 47 in be - - diva – aagasan - datiwali railway crossing proposed laying of 1000 mm dia rcc casing pipe for carrying 400 mm dia & 500 mm dia ms water carrier pipe across under the railway track between es no 43/45, 43/47 in between diwa- dativali junction and between es no 45/3, 45/4 dativali aagasan railway station respectively by micro tunneling method.

State Government

CTN :43455125 Due date: 16 Jan, 202616 Jan, 2026 NA
Tender For laying of 33kv 3c 400 sq.mm ug cable by micro tunneling work with laying of hdpe pipe for 0.912 km and by open cut method for 0.238 km for drawl of nbu - embee delight 33kv circuit-2 from nbu gss to phansidewa underpass more including 2 nos highway c

State Government

CTN :43372407 Due date: 27 Jan, 202627 Jan, 2026 4.20 Lacs
Tender For laying of 11 kv 95 sq mm xlpe ug cable through micro tunneling work with supply of 110 mm diameter hdpe pipe for normal road along with outdoor end terminal jointing 3x95 sq mm at nayabaz gip colony dist howrah

State Government

CTN :42662642 Due date: 28 Jan, 202628 Jan, 2026 4.19 Lacs
Tender For corrigendum : conversion of 33 kv oh line crossing across nh-6 by micro-tunneling with 200 mm dia hdpe pipe (pe-80, pn-6) and laying of 33 kv,3c,400 sq mm cable for 33 kv kona-kona tt feeder near nibra more, howrah-1 division of howrah region - conversion of 33 kv ovehead line crossiing across nh-6 by micro tunneling with 200 mm dia hdpe pipe (pe-80, pn-6) and laying of 33 kv. 3c, 400 sq mm cable for 33k kona-kona tt feeder near nibra more, under howrah-i of howrah region under howrah region, wbsedcl.

State Government

CTN :42691797 Due date: 28 Jan, 202628 Jan, 2026 4.02 Lacs
Tender For corrigendum : conversion of 33 kv overhead line crossing across nh16 by micro tunneling with 200 mm dia hdpe pipe (pe80, pn-6) and laying of 33 kv, 3c, 400 sq.mm cable for 33 kv liluah kona feeder near kona , howrah-i division of howrah region. - conversion of 33 kv overhead line crossing across nh-16 by micro tunneling with 200 mm dia hdpe pipe (pe-80, pn-6) and laying of 33 kv, 3c, 400 sq mm cable for 33 kv liluah-kona feeder near kona of howrah-i division under howrah region, wbsedcl.

CTN :43312255 Due date: 12 Jan, 202612 Jan, 2026 2.83 Crore
Tender For laying of 1700 mm dia. ms casing pipe by micro tunneling method for railway crossing for laying 1400 mm dia. ms carrier pipe. (job no.12/2025-26). (reinvite)

State Government

CTN :43327932 Due date: 13 Jan, 202613 Jan, 2026 NA
Tender For shifting of existing 11 kv htoh line (bholanath, tarakeswar feeder emanating from tarakeswar 132/33/11 kv sub station) by micro tunneling method with 11 kv 3cx300 sq mm xlpe ug cable at tarakeswar station area under tarakeswar division.

State Government

CTN :41524390 Due date: 20 Jan, 202620 Jan, 2026 3.70 Crore
Tender For corrigendum : technical specification point wise dbs implant & accessories - dbs rechargeable with directional lead with25yr battery life & image guided programming integrated inside clinician programmer with micc multiple independent current control technology with zero volt technology,bluetooth connectivity with clinician and patient programmers, usfda & ce approved kit contents: rechargeable pulse generator-1 , directional lead kit -2 , extension kit -2 , burr hole locking kit -2 , tunneling tool -1 , patient remote control kit -1, patient charging kit -1 , dbs rechargeable with non directional lead with 25yr battery life & image guided programming integrated inside clinician programmer micc multiple independent current control technology with zero volt technology,bluetooth connectivity with clinician and patient programmers. have 8 contact non-directional lead kit with array span of 15.5mm for maximum coverage, usfda & ce approved kit contents:rechargeable pulse generator -1, non-directional lead kit -2, extension kit -2, burr hole locking kit -2, tunneling tool -1, patient remote control kit -1, patient charging kit -1, dbs non rechargeable with directional lead with image guided programming integrated inside clinician programmer micc multiple independent current control technology &bluetooth connectivity with clinician and patient programmers,usfda & ce approved kit contents: non-rechargeable pulse generator -1 , directional lead kit -2 , extension kit -2, burr hole locking kit -2 , tunneling tool -1 , patient remote control kit -1,), dbs non rechargeable with non-directional lead with image guided programming integrated inside clinician programmermicc multiple independent current control technology withbluetooth connectivity with clinician and patient programmers. should have 8 contact non-directional lead kit with array span of 15.5mm for maximum coverage,usfda & ce approved kit contents: non-rechargeable pulse generator -1, non-directional lead 1), dbs implant kit with non-rechargeable, 3t mri compatible and sensing enabled ipg and directional leads.the implanted pulse generator (dbs neurostimulator- ipg) should have a minimum service life of 5-7 years and there should not be a need to recharge it periodically.ipg should have the capability for group programming and ability to store the programming data in ipg itself and retrieve from ipg.the system should be able to sense local field potentials (lfps) from brain targets and this data should be accessible through the physician programmer. the leads should be able to stimulate in specific directions, in addition to the ability to stimulate circumferentially. markers on leads should facilitate directional programming even if lead rotates. the leads should also be able to sense lfps.burrhole kit should be there for securing lead in place. microelectrodes for intra op stimulation and recording should be there.the extension connecting the lead and ipg should be flexiblethere should be a tunneller to place the extension wire and the tunneller should be metallic and firm to enable smooth tunnelling.the system should have approval for conditional full-body 1.5t & 3t mri compatibility.patient programmer, enabling the patient to see and if needed, modify the stimulation under guidance, should be available. patients should be able to mark dyskinesia, tremor etc. using the programmer., dbs implant kit with rechargeable, 1.5t & 3t mri compatible and sensing enabled ipg and directional leads.the implantable pulse generator (dbs neurostimulator- ipg) should have a service life of 15+ years if regularly recharged by the patient at specified intervals.ipg should have the capability for group programming and ability to store the programming data in ipg itself and retrieve from ipg.the system should be able to sense local field potentials (lfps) from brain targets and this data should be accessible through the physician programmer. the system shou

State Government

CTN :43155586 Due date: 19 Jan, 202619 Jan, 2026 8.91 Lacs
Tender For re-routing of 33 kv line by laying of 3c xple 400 sq mm by micro tunneling work of 415 mtr with laying of hdpe pipe (200sq mm pe-100,pe-10 ) for railway crossing at kanchrapara kalyani rail crossing and road crossing near snr carnival under naih
 Loading, Please wait...

Connect us via What's Up