Get complete information related to latest Stainless Steel Tube Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Stainless Steel Tube Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Stainless Steel Tube Tenders.
Tender For bid to ras tender for supply of pipe copper rd s/l ed 54.05-53.98 id 50.8 th 2.34 mm , pipe steel copper annealed rd seamless 12.3 kg/cm2 ed 15.14 , ms pipe od 114mm x thick 10mm , tube nickel soft copper 90 x 5 , tube ms 5x234 wdg solid drawn in 15-20ft , for steam pipes , pipe copper nickel 90/10 (od16x1.0 mmwt) , pipe copper nickel 90/10 (od 194.5x3.0 mmwt)
Tender For supply of tubesteel seamless heavy duty (pipe) 32 mm, nb x 4 mm to is 1239 part -i/1990 or latest. running length between 5 to 7 meter per piece.
Tender For supply of replacement of walking plaza speaker , rewiring of walking plaza copper cable 1.5mm , bell stand made by stainlesssteeltube 42mm with heavy base height 6' , iron frame for cut model engine assy
Tender For supply of stainlesssteeltubes and double ferrule fittings for air spring pneumatic contr ol equipment and fiba pipe arrangement, as per icf specification no.-icf/md/spec-166, issue sta tus: 01, rev. no.04, date:- 28/08/2019%a0with amendment no. 1 , date of issue 07/01/2022 and am endment no.2, date of issue 24/11/2022 and material schedule icf/sk-10-2- 637, issue status- 01, rev .00, cs-01 & mcf cs-04 dt.22.02.2022 & cs-05 dt.18.07.2022 & amendment to cs05. packing instruct ion: spi042 (dff) [ warranty period: 48 months after the date of delivery ]
Tender For supply of stainlesssteeltubes and double ferrule fittings for mrvc/d/bt coaches as per icf/spec.no.icf/md/spec-166,issue status-01,rev-04,amd-01 & amd-02 and material sched ule no.icf/sk/10-2-579, issue status-01 rev.03,cs-01& cs-02. [ warranty period: 48 months afte r the date of delivery ]
Tender For supply of stainlesssteeltubes and double ferrule fittings for lwsczac and lwfczac (lhbeog) coaches as per icf specification no. icf/md/spec -166,,issue status-01, rev-04, amd -01 & amd-02 and to material schedule no.icf/sk-10-2-638 ,issue status-01,rev.no.01,cs-01,c s-02,cs-03 & cs-04. [ warranty period: 48 months after the date of delivery ]