Web Analytics Made Easy - StatCounter

Automatic Boom Barrier Tenders

Get complete information related to latest Automatic Boom Barrier Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Automatic Boom Barrier Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Automatic Boom Barrier Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45693646 Due date: 07 Jul, 202607 Jul, 2026 13.31 Lacs
Tender For supply, installation, testing and commissioning of automatic boom barriers (14 nos in different areas of skims)

Central Government/Public Sector

CTN :45652396 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45664839 Due date: 03 Jul, 202603 Jul, 2026 NA
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45638111 Due date: 20 Jul, 202620 Jul, 2026 NA
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]

Central Government And Public Sector

CTN :45225508 Due date: 27 Jun, 202627 Jun, 2026 NA
Tender For corrigendum : supply of automatic boom barrier

CTN :45470117 Due date: 22 Jun, 202622 Jun, 2026 NA
Tender For corrigendum : supply of automatic boom barrier auto barrier with brush less motor working voltage , push button and photo cell sensor , cable work included installation commissioning and wiring , cement concrete base foundation digging leveling compaction of cement ratio one two four , ups for power backup one kva

CTN :45361613 Due date: 18 Jun, 202618 Jun, 2026 NA
Tender For bid to ras providing of customized amc/cmc for pre-owned products - camc of automatic hydraulic bollard and automatic boom barrier; camc of automatic hydraulic bollard and automatic boom barrier; annual maintenance contract (amc); quarterly; no

State Government

CTN :45470529 Due date: 27 Jun, 202627 Jun, 2026 NA
Tender For supply of automatic boom barrier system

CTN :45163536 Due date: 11 Jun, 202611 Jun, 2026 NA
Tender For bid to ras supply of integrated road spike barrier with automatic boom barrier and power backup

State Government

CTN :45415409 Due date: 09 Jun, 202609 Jun, 2026 10.52 Lacs
Tender For providing and installation of 10 nos automatic boom barrier at various location in patparganj assembly constituency ac 57.
 Loading, Please wait...

Connect us via What's Up