Tender For supply of bogieframearrangement for self generation ac coaches (with fabricated l-section longitudin als) to drawing no. wtac4-0-3-402, alt-m/3 col ii confirmimg to rdso specn c-9202 rev 02 and the firm sha ll fulfil the requirement as per icf/md/specn 147, issue status, rev 02 [ warranty period: 30 months after t he date of delivery ]
Tender For supply of bogieframearrangement - 13t for non ac main line coaches to drg no t-0-3-920 alt-d col -i (with guide) without nylon bushes wherever applicable & rdso specn c-9202 rev-2. the bogieframe s hall be strengthened as per rdso drg. no. cg-17066 alt. 2, the material of the strengthening rib and cha nnel should be as per drg no. cg-17066 alt. 2. the firm shall fulfil the requirement as per icf/md/specn. 147 issue status: 01, rev. 02. paint scheme shall be as per drawing. [ warranty period: 30 months afte r the date of delivery ]
Tender For supply of 16.25 t icf bogieframearrangement for self generation ac coaches to drawing no wtac4 -0-3-402, alt. b/3, col-ii (with guide) & rdso specn. c-9202, rev-2, the bogieframe shall be strengthene d as per rdso drg. no. cg- 17066 alt. 2, the material of the strengthening rib and channel should be as p er drg. no.cg-17066 alt. 2, the firm shall fulfil the requirement as per icf/md/specn.147 issue status: 01, rev.02. the paint scheme shall as per drawing. warranty period:- 5 years from the date of commissionin g of service [ warranty period: 60 months after the date of delivery ]
Tender For supply of 16.25 t icf bogieframearrangement for self generation ac coaches to drawing no wtac4-0-3-402, alt. h/3, col-ii (with guide) & rdso specn. c-9202, rev-2, the firm shall fulfil the requirement as per icf/md/specn.147 issue status: 01, rev.02. the paint scheme shall as per drawing.
Tender For supply of bogieframearrangement for 1600hp ac-ac dmu/dpc coaches, as per drawing: dmu/dpc/ss-0-3-001 alt.'gr2' col.1 (without bush to drg. no. emu/m-3-2-060), packing instruct ion: bogieframe (pl nos:- 35327017, 30984348, 30986000, 30985912) each guide on bogie fra me to be properly wrapped with biodegradable transparent plastic sheet. machined por tion of bogieframe components should be covered with suitable eco friendly cushioni ng material. wooden/suitable spacers having adequate strength to be provided betwee n bogieframes to prevent rubbing against each other during transportation/loading/ unloading. supplier to ensure that bogieframe should be transported with utmost saf ety till unloading in shell depot so that components are not damaged fitted on bogie f rame and dimensions duly maintained. a list (easily visible) should be pasted on each bo x showing po no. , pl no., description, drawing. no./spec, qty, firm's name & address and dispatch detail etc. for identification. transit damage if any shall be at the cost of sup plier. , proction procedure: as per drawing [ warranty period: 66 months after the date of deliver y ]