Tender For corrigendum : supply of bogieframearrangement as per blw drawing no. 17023889 (part no. 17023889), qpl- 2 no. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of bogieframearrangement for 3ph memu16t a/s trailor coaches, as per drawing no. et03150 alt 'f' or latest, (without bush to drawing no. cc03124 & cc32279) materials specification as per rdso spec. c-9202, (latest version) make: crg or similar (icf approved item id: 2300028, bogieframes (except fiat bogieframe) [ warranty period: 30 months after the date of delivery ] ]
Tender For auction sale of depot miscellaneous scrap - scrap mixed rubber items with or without ms attachment consisting bp & fp rubber hose pipe, mr & bc rubber hose pipes, bogie sander rubber pipes, bogie to body rubber pipes, compressor mounting pad, sandwitch mountaing pad including ferrous & other rubber items released from ac locomotives. weight= 10 mts. for custodian information ss-11 no. nkj/trs/scf/26-27/8 dt. 01.06.2026. ds-8 note no. 020723 dt. 01.06.2026. mode of delivery by actual weight only. (remark- 1. sale condition "as is where is basis" & uniform sale condition for e-auction is applicable. 2. the purchaser of the awarded lot are advised not to wait for last date of fdp considering the forthcoming mansoon season. all efforts should be made to lift the lot as early as possible.)
Tender For supply of bogieframearrangement for air spring type memu/dmc bogies (fuji type traction motor) as per drg. no. em03150 alt. c without bushes to drg. no. emu/m-3-2-060 (with rdso spec. no. c-9202 rev-02) . [ warranty period: 30 months after the date of delivery ] ]
Tender For auction sale of depot ferrous scrap - pl no.98050047, sc. c and w fittings consisting of composite brake block, brake pad, snubber pad, sandwitch mounting pad, sliding wheel, wheel for composite rubber with m.s attached, elastromeric pad, sb rubber pad, brake shoe, b.p. and f.p. hose coupling, k type bk. block, buffer pad , air hose connection and miscellaneous composite rubber items of sorts and sizes. please check special condition and detailed conditions / amendments / modifications if any in depot condition before bidding.
Tender For supply of set of rib & channel for strengthening bogieframearrangement of 13 t icf coaches to drg. no.cg-17066, alt.-4 consisting of 03 items as per annexure attached. packing instruction: each item to be packed separately duly labeled with description & drawing no. [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of bogieframearrangement for emu trailer coaches with 180/150kn air spring-(qr code as per cde/rcf letter no. md44121 dt. 24.11.2021.), as per drawing: icf/mrvc/d-0-3-001 alt.'lr1' col.1 (without bush to drg. no. emu/m-3-2-060), packing instruction: bogieframe (pl nos:- 35327017, 30984348, 30986000, 30985912) each guide on bogieframe to be properly wrapped with biodegradable transparent plastic sheet. machined portion of bogieframe components shouldbe covered with suitable eco friendly cushioning material. wooden/suitable spacers havingadequate strength to be provided between bogieframes to prevent rubbing against each other during transportation/loading/unloading. supplier to ensure that bogieframe shouldbe transported with utmost safety till unloading in cs/avd so that components are not damaged fitted on bogieframe and dimensions duly maintained. a list (easily visible) should bepasted on each box showing po no. , pl no., description, drawing. no./spec, qty, firm's name &address and dispatch detail etc. for identification. transit damage if any shall be at the cost of supplier. , proction procedure: as per drawing [ warranty period: 66 months after the date of delivery ]
Tender For supply of bogieframearrangement for emu trailer coaches with 180/150kn air spring-(qr code as per cde/rcf letter no. md44121 dt. 24.11.2021.), as per drawing: icf/mrvc/d-0-3-001 alt.'lr1' col.1 (without bush to drg. no. emu/m-3-2-060), packing instruction: bogieframe (pl nos:- 35327017, 30984348, 30986000, 30985912) each guide on bogieframe to be properly wrapped with biodegradable transparent plastic sheet. machined portion of bogieframe components shouldbe covered with suitable eco friendly cushioning material. wooden/suitable spacers havingadequate strength to be provided between bogieframes to prevent rubbing against each other during transportation/loading/unloading. supplier to ensure that bogieframe shouldbe transported with utmost safety till unloading in cs/avd so that components are not damaged fitted on bogieframe and dimensions duly maintained. a list (easily visible) should bepasted on each box showing po no. , pl no., description, drawing. no./spec, qty, firm's name &address and dispatch detail etc. for identification. transit damage if any shall be at the cost of supplier. , proction procedure: as per drawing [ warranty period: 66 months after the date of delivery ] ]
Tender For supply of bogieframearrangement for non ?ac crashworthy coach (with rolled section longitudinals & head stock)conforming to rdso specification c-9202 revision-2 & icf spec. no. icf/md/spec.-147, rev.-2, amend.-1 and to icf drawing no. gs7-0-3-701,col-i, alt.-d/nil. [ warranty period: 60 months after the date of delivery ] ]