Web Analytics Made Easy - StatCounter

Co2 Flooding System Tenders

Get complete information related to latest Co2 Flooding System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Co2 Flooding System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Co2 Flooding System Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45595074 Due date: 08 Jul, 202608 Jul, 2026 6.97 Lacs
Tender For servicing, refilling, pressure testing and painting of co2 flooding system and portable fire extinguishers at gdph

Central Government/Public Sector

CTN :45057612 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For corrigendum : supply of co2 flooding system at ups room

CTN :45557476 Due date: 19 Jun, 202619 Jun, 2026 NA
Tender For supply of spares for co2 flooding system of det-tronics make as per sor

CTN :45033413 Due date: 05 Jun, 202605 Jun, 2026 NA
Tender For bid to ras supply & fixing of accessories for industry interaction centre - modular multipurpose divider & wall coverage panel (2700 mm x 900 mm), 36mm thick shutter panel with laminate finishes, modular interaction table (1650mm * 700mm * 750mm), modular workstation table (1350mm * 700mm * 750mm), work station 3 drawer pedestal unit (450mm * 450mm * 650mm), acoustic resistant roof panel (rock gyp fire resistant - rh-99), 2mm thick sheet poly coated plank 150mm * 1050mm, product display unit along with accessories, refurbishment work of existing cabins and existing sliding systems slider shutters and units

CTN :45293358 Due date: 25 May, 202625 May, 2026 NA
Tender For procurement of valves for co2 flooding system at bpcl mr

State Government

CTN :45259546 Due date: 04 Jun, 202604 Jun, 2026 4.11 Lacs
Tender For following works shall be carried out quarterly during the contract period for the two identical sets of co2 flooding system at mghe power house. the one set of system for carting to the units-1,2,3&4 and the second set of system for carting to units-5,6,7&8. i)cleaning of heat detector externaly with dry cloth ii)ensure working condition of heat detectors iii)cleaning of smoke detector externaly with dry cloth iv)ensure working condition of smoke detectors v)simulate heat and smoke detector simultaneously and check for cross zone vi)checking for leakage in pilot cylinder vii)checking the weight of co2 pilot cylindersviii)check the condition of co2 pilot hose ix)check the condition of co2 discharge hose x)inspect pressure switch and check for its functioning xi)inspect maual call points and check for its functioning xii)inspect abort switch and check for its functioning xiii)inspection of online weigh monitor and check for its functioning xiv)inspect hooter with strobe and check for its functioning xv)checking for healthiness of the battery xvi)checking the condition for slave nrv xviichecking the condition for master nrv xviii)checking of solenoids. xix)refilling of co2 cylinder and pressure testing 45 kg capacity and 4.5kg capacity (in case release of co2 gas during generator fire incidents) xx)any other work connected with the system not explicitly mentioned shall also be carried out for safe and proper operation of the system. xxi)conducting the demo of operation of the co2 flooding system twice (once in 2 quarter) during the annual maintenance contract period for kpcl staff.

CTN :45124160 Due date: 21 May, 202621 May, 2026 45.00 Lacs
Tender For purchasing work of essential fire safety and rescue equipments - sledge hammer head material: alloy steel handle material: plastic & rubber product dimensions: 80 cms item weight:5 kg. grip type : contoured head style: flat, crow bar made out of carbon steel duly hardened thickness: 20 mm : : 22 mm : : 25 mm : : 28 mm : size: 900mm : : 1200mm: : 1500mm: : 1800mm:, fireman axe certification: - material: - carbon steel voltage test: - 20,000 volt weight: - 1.5-2.5 kg overall length: - up to 2ft handle material: - wood note: a valid product approval certificate for the proposed brand/make, issued to the firemans axe oem, must be attached to the technical bid. bids received without the oems approval certificate will not be considered further and will be disqualified from price-bid opening., fire fighting helmet style: protection, safety isi marked: is: 2925 of 1984 shell material: high density polyethylene (hdpe) strap material: low density polyethylene (ldpe) adjustable chin strap: nylon chinstrap and rachet type head band slot fix design: provision for easy clip on accessories like face shields and earmuffs colour- yellow adjustable and detachable head band., gum boot indian standard for gumboots:is 15298 (part 2): covers safety footwear, including pvc gumboots with steel toes (often referred to in industrial settings for impact resistance) is 5852: refers specifically to protective rubber knee boots (commonly used in mining, construction, and agriculture).steel toe - gumboots / industrial & construction footwear flexisafe isi marked steel toe pvc gumboots, is:5852 certified safety shoes for industrial, agriculture, mining and rainwear use | waterproof, anti-slip, oil resistant., ceiling hook (fire hook) hook: - forged steel handle: - bamboo pole (3 mtrs length) length (approx.): - 3.0 mtrs weight (approx.): - 3.5 kgs, life jacket technical specifications of solas life jackets adult a-1 are as under; solas lifejacket a-1, adult (pfd) is approved by the indian register of shipping (irs) as per latest international solas regulations, with valid certificate weight: 1.000- 1.100 kgs dimensions: length 45 cms x 68 cms x 8cms floatability of above 16.5 kgs comfortable to wear with a shirt like fit. extremely lightweight and slim in design it can be donned in one way only, in a period of 1 minute without assistance, guidance or prior demonstration has heavy duty buckles for fastening has sufficient buoyancy, with 7 pieces of 10mm foam each in the front and 2 pieces of 10mm foam each in the back, to lift the mouth of an unconscious wearer not less than 120mm clear of the water as per latest solas & lsa regulations the materials used for the covers, tapes and seams of the solas lifejacket a-1, adult (pfd) shall be tested as per iso 12402-7, at government approved laboratories to establish that they are rot proof, colour fast and resistant to deterioration from exposure to sunlight and are not unduly affected by seawater, oil, fungal attack and meet all criteria of tensile and strength shows no deterioration after immersion in diesel oil for 24 hours meets the body strength and shoulder strength test prescribed in solas, regulations, wherein a load of 326 & 90kgs respectively are attached for a period of 30 minutes and then there is no physical deterioration in the lifejacket fitted with approved retro reflective tape of 31 at four strategically high places on the lifejacket for immediate and maximum visibility does not sustain burning or continue melting after being totally enveloped in a fire for a period of 2 seconds fixed with a buddy line of 1.5 meters for rescue as per latest specifications a special feature of solas lifejacket a-1, adult (pfd) shall be such that being extremely slim and lightweight can be easily stacked and stored, saving valuable storage space meets solas 74 as amended, reg iii/4. iii/7.1, iii/34, x/3 lsa code, reg.i/1.2 and ii/2.1.1, msc.207(81), imo resolution msc 81(70), msc 200 (80), msc 226(82

CTN :45177740 Due date: 15 May, 202615 May, 2026 NA
Tender For subject :- oem tender for procurement of valves for co2 flooding system for fire & safety dept.at bpcl mumbai refinery.

Central Government / Public Sector

CTN :43742629 Due date: 09 May, 202609 May, 2026 NA
Tender For bid to ras providing of refilling of fire extinguisher cylinders - hydrotesting, painting and refilling of co2 flooding system cylinders, co2 fire extinguishers and clean agent fire extinguishers; hydrotesting of co2 (45 kg) cylinders; as per nit,refilling of fire extinguisher cylinders - hydrotesting, painting and refilling of co2 flooding system cylinders, co2 fire extinguishers and clean agent fire extinguishers; refilling of co2 (45 kg) cylinders; as per nit,refilling of fire extinguisher cylinders - hydrotesting, painting and refilling of co2 flooding system cylinders, co2 fire extinguishers and clean agent fire extinguishers; painting of c02 (45 kg) cylinders; as per nit,refilling of fire extinguisher cylinders - hydrotesting painting and refilling of co2 flooding system cylinders co2 fire extinguishers and clean agent fire extinguishers; hydrotesting of co2 22.5 kg cylinders; as per nit,refilling of fire extinguisher cylinders - hydrotesting painting and refilling of co2 flooding system cylinders co2 fire extinguishers and cl

State Government

CTN :44962070 Due date: 07 May, 202607 May, 2026 4.11 Lacs
Tender For following works shall be carried out quarterly during the contract period for the two identical sets of co2 flooding system at mghe power house. the one set of system for carting to the units-1,2,3&4 and the second set of system for carting to units-5,6,7&8. i)cleaning of heat detector externaly with dry cloth ii)ensure working condition of heat detectors iii)cleaning of smoke detector externaly with dry cloth iv)ensure working condition of smoke detectors v)simulate heat and smoke detector simultaneously and check for cross zone vi)checking for leakage in pilot cylinder vii)checking the weight of co2 pilot cylindersviii)check the condition of co2 pilot hose ix)check the condition of co2 discharge hose x)inspect pressure switch and check for its functioning xi)inspect maual call points and check for its functioning xii)inspect abort switch and check for its functioning xiii)inspection of online weigh monitor and check for its functioning xiv)inspect hooter with strobe and check for its functioning xv)checking for healthiness of the battery xvi)checking the condition for slave nrv xviichecking the condition for master nrv xviii)checking of solenoids. xix)refilling of co2 cylinder and pressure testing 45 kg capacity and 4.5kg capacity (in case release of co2 gas during generator fire incidents) xx)any other work connected with the system not explicitly mentioned shall also be carried out for safe and proper operation of the system. xxi)conducting the demo of operation of the co2 flooding system twice (once in 2 quarter) during the annual maintenance contract period for kpcl staff.
 Loading, Please wait...

Connect us via What's Up