Get complete information related to latest Co2 Flooding System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Co2 Flooding System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Co2 Flooding System Tenders.
Tender For supply of breathing air compressor,folding scoop stretcher,folding stretcher,spin board stretcher,inflatable shelter,chemical suit,throwable emergency rescue inflatable survival rescue,large double webbed layer nylon rescue net min 50 ft dia,rain protection coat, yellow with hood,light warning jackets,electrician gloves 2000v size 10 length 36cm,head protection gloves aluminized,3 layer aluminized fire proximity sute with b a set arrangement,water gel blanket,threaded barrel closure,plicane 3345 elpel 3345,rope launcher,rope ladder of polypropylene 20 m,tripod system with winch descenders and ascenders,pelican 2410n dive light nemo water proof underwater use,chain lifting 3 ton complete with end ring and shackles with 6 mtrs chain,pulling and lifting machine 5 ton,pulling and lifting machine 3 ton,safety belt with hook full body harness karam make,longline 30 meter size 50mm circumference,lowering line 30 meter size 50mm circumference,manila rope 30 meter size 50 mm circumference,rubber cable reel,rescue tool with meta
Tender For following works shall be carried out quarterly during the contract period for the two identical sets of co2floodingsystem at mghe power house. the one set of system for carting to the units-1,2,3&4 and the second set of system for carting to units-5,6,7&8. i)cleaning of heat detector externaly with dry cloth ii)ensure working condition of heat detectors iii)cleaning of smoke detector externaly with dry cloth iv)ensure working condition of smoke detectors v)simulate heat and smoke detector simultaneously and check for cross zone vi)checking for leakage in pilot cylinder vii)checking the weight of co2 pilot cylindersviii)check the condition of co2 pilot hose ix)check the condition of co2 discharge hose x)inspect pressure switch and check for its functioning xi)inspect maual call points and check for its functioning xii)inspect abort switch and check for its functioning xiii)inspection of online weigh monitor and check for its functioning xiv)inspect hooter with strobe and check for its functioning xv)checking for healthiness of the battery xvi)checking the condition for slave nrv xviichecking the condition for master nrv xviii)checking of solenoids. xix)refilling of co2 cylinder and pressure testing 45 kg capacity and 4.5kg capacity (in case release of co2 gas during generator fire incidents) xx)any other work connected with the system not explicitly mentioned shall also be carried out for safe and proper operation of the system. xxi)conducting the demo of operation of the co2floodingsystem twice (once in 2 quarter) during the annual maintenance contract period for kpcl staff.