Web Analytics Made Easy - StatCounter

Cooling Pipe Tenders

Get complete information related to latest Cooling Pipe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cooling Pipe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cooling Pipe Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45057581 Due date: 16 May, 202616 May, 2026 9.50 Lacs
Tender For supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of

CTN :45018596 Due date: 05 May, 202605 May, 2026 NA
Tender For supply of ashok leyland 680 engine spare parts - valve guide 12 us , rubbers with clip, block to water pump. , 135 a gear box housing , 19 benjo bolt diesel pipe 3 ft , 19 benjo bolt diesel pipe 2 ft , 19 benjo bolt diesel pipe 1"1/2ft , 19 benjo bolt diesel pipe running ft , accelerator cable joint , adapter nozzle holder , air cleaner assy fiber , air cleaner element , air filter pipe 4" dia rubber pipe , alternator belt a/60 , aluminium patti (strips) 4mm , asbestos sheet (fire retardant) , bearing set , bosch pumps assembly. , bosch pump timing rod shims 6 nos , breather hose with inner spring , bundy pipe sub assy , bushing valve guide kit , cam shaft , cam shaft bushing , cam shaft key , cam shaft thrust washer (10mm) , cam shaft thrust washer (std) , clutch rubber cup 06 nos , clutch casing gear box , engine oil cooler pressure rubber pipe 2 nos (cooler to oil filter) engine oil cooler plug 02 nos, engine oil cooler assy engine cooling pipe, engine block aluminium side cover. element oil cooler sub assy, dunlop rubber pipe 3"1/2 dia dunlop rubber pipe 3" dia, dunlop rubber pipe 2"3/4 dia dunlop rubber pipe 2"1/4 dia, dunlop rubber pipe 2"1/2 dia dunlop rubber pipe 2" dia, dunlop rubber pipe 1"3/4 dia dunlop rubber pipe 1"1/2 dia, dunlop rubber pipe 1" dia crank shaft oil seal, crank shaft main bearing set-std 10/us crank shaft key, crank shaft gear cork sheet 8mm, cork sheet 4mm connecting bearing(0.25mm)/10us, connecting bearing bush connecting bearing (std), composite valve seat kit 5 double benjo bolt, 5 distributor sleeve 4 dip stick with guide, 36 crank shaft 35 connecting rod, 3 cylinder head gasket repair kit -2 cylinder head gasket, 11 cylinder block exhaust manifold plate with packing (04 nos), exhaust manifold assembly. (2 nos), exhaust manifold (single)., exhaust valve, accelerator cable 12ft, accelerator cable 15ft, accelerator cable 18ft, exhaust valve 6 nos, fly wheel ring gear, flywheel lock patti, flywheel mounting bolt, fresh water pump assy, fresh water pump coupling rubber, fuel filter (bosch) primary/secondary (big), fuel filter (bosch) primary/secondary (small), fuel filter cum water separator, gasket for intake manifold, gasketed nozzle holder, gasket thermostat, gear box input coupling adopter, gear box input shaft assembly, gear box input shaft drive gear, gear box input shaft left hand gear, gear box main shaft assembly with coupling, gear box main shaft gear, gear box oil cooler assy, gear box oil cooler pressure pipe (02 nos), gear box oil pressure gauge, gear box oil pressure pipe (04 nos), gear cable 12ft, gear cable 15ft, gear cable 18 ft, gear injection pump drive, gear lever assy rh/lh, , main bearing (std), main bearing (0.25mm)/10us, l hose pipe silicone. 1"3/4 dia, intake valve, inlet valve (6 nos), inlet manifold assembly., injector rubber cap.(6 nos), injector over flow pipe copper., injector high pressure steel pipe., injector copper washer ( 6 nos), injector (new) 6 nos, idler gear, heat exchanger side cover (new), heat exchanger rod with copper nut, heat exchanger copper pressure cap, heat exchanger copper jali (new), heat exchanger bend pipe steel 1½" dia, heat exchanger bend pipe steel 1"1/4 dia, heat exchanger bend pipe steel 1" dia, heat exchanger assembly, heat exchanger aluminium body 1" (21 bolt with washer ), heat exchanger "o" ring, gear oil pump transmission gear, gear lever repair kit, gear lever cable ball joint, gear lever cable 18 ft, gear lever cable 15ft, gear lever cable 12 ft, gear box coupling nut bolt 32mm steel, air intake system component kit, 5 hose assy filter to fip, 5 hose assy feed pump, 4 hose assy, 3 heat exchanger aluminium body (new), minor repair kit, o ring for camshaft, oil bath air cleaner, oil cooler "o" ring, oil filter (bosch), oil paper packing, oil pressure rubber pipe 12 ft, oil pressure rubber pipe 15 ft, oil pressure rubber pipe 18 ft, oil pressure gauge (engine), oil pump assembly, oil pump strainer, overall gasket, piston ring set, pist

CTN :45034522 Due date: 09 May, 202609 May, 2026 NA
Tender For supply of assy hose 3 8 inch with o ring and 490mm , air pressure pipe assy , brake pad , rectifier assy lucas , speedo drive complete plastic , knob gear shifting lever , pipe intake , oil seal , spring brake actuator type 24 24 , km cable , gear lever kit , bushing king pin , kick spring , axual roller brg , cyl head gasket , dust boot , wheel brg frt , oil filter , cover cyl head cover , suspension bush kit , ac filter , coolant hose piper , rear wheel hub assy , air cooling pipe , radiator hose inlet outlet , pad set disc brake , brake shoe set , lover arm left , lover arm right , timing tensioner

CTN :44757118 Due date: 27 Apr, 202627 Apr, 2026 9.00 Lacs
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f

Central Government/Public Sector

CTN :44947338 Due date: 11 May, 202611 May, 2026 NA
Tender For supply of o ring suitable for transformer oil cooling pipe for wag-9 loco, size od-104 mm, id-92 mm, wire dia.- 6 mm as per clw specification no. clw/es/3/0142alt-d or latest. material fluor-silicon rubber mfq hardness 60 plus or minus 5 shore [a ]

Central Government/Public Sector

CTN :44598687 Due date: 20 Apr, 202620 Apr, 2026 NA
Tender For bid to ras supply of 4203081491-cooling pipe assy, thre50iii

CTN :44857287 Due date: 27 Apr, 202627 Apr, 2026 NA
Tender For supply of set of bend pipes from radiator to mph and transformer for 5400 kva transformer of locos (1) ss oil cooling pipe with flange for 5400 as per drg. no.- sr.dee/rs/ed/elect-129 (2) ss bellow with attachment for 5400 kva transformer as per drg. no.- sr.dee/rs/ed/elect-129. [ warranty period: 30 months after the date of delivery ]

CTN :44845656 Due date: 24 Apr, 202624 Apr, 2026 NA
Tender For providing of repair and overhauling service - repairs and solvent cleaning onboard submarine batteries links cooling pipes- in ship; any other suitable brand; no; buyer premises

Central Government / Public Sector

CTN :44819692 Due date: 16 Apr, 202616 Apr, 2026 NA
Tender For corrigendum : supply of set of spares for anestiwata compressor as detailed:1) oil seal to anestiwata part no: 91222000,qty/set: 10 nos,2) adopter to anestiwata part no: 91163590,qty/set: 05 nos,3) oil gauge packing to anestiwata part no: 91283000,qty/set: 05 nos,4) oil gauge set to anestiwata part no: slsp0034,qty/set:05 nos,5) oil gauge adapter to anestiwata part no: slsp0038,qty/set: 05 nos,6)stick oilgauge to anestiwata part no: slsp0041,qty/set: 05 nos,7) delivery pipe set (ac to final flange) to anestiwata part no: spcs0019,qty/set: 5 nos,8)intake filter set to anestiwata part no: slsp0035,qty/set: 5 nos,9)delivery flange assembly to anestiwata part no: spcs0026,qty/set: 05 nos,10) elbow,union to anestiwata part no: 96800282,qty/set: 05 nos,11) breather pipe to anestiwata part no: 91295000,qty/set: 05 nos,12)o-ring (delivery flange) to anestiwata part no: rr1000-35,qty/set: 05 nos,13)cooling pipe set to anestiwata part no: spcs0006,qty/set: 05 nos. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44791613 Due date: 24 Apr, 202624 Apr, 2026 NA
Tender For corrigendum : supply of set of flour silicon rubber 'o' rings as per els/aq sketch no. els/aq/wag-9/sk.no.0033/rev-02, suitable for transformer oil cooling pipes (metallic pipes) flange type-a,b,c,d,f,g,l, k & m as per abb id no: 3ehn.424150 & clw specn no. clw/es/3/0142 alt-f or latest for wag-9 loco [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up