Web Analytics Made Easy - StatCounter

Cooling Pipe Tenders

Get complete information related to latest Cooling Pipe Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Cooling Pipe Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Cooling Pipe Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :44845656 Due date: 24 Apr, 202624 Apr, 2026 NA
Tender For providing of repair and overhauling service - repairs and solvent cleaning onboard submarine batteries links cooling pipes- in ship; any other suitable brand; no; buyer premises

CTN :44835986 Due date: 28 Apr, 202628 Apr, 2026 NA
Tender For corrigendum : auction sale of others - scrap di 300 mm dia. pipe.

Central Government / Public Sector

CTN :44819692 Due date: 16 Apr, 202616 Apr, 2026 NA
Tender For corrigendum : supply of set of spares for anestiwata compressor as detailed:1) oil seal to anestiwata part no: 91222000,qty/set: 10 nos,2) adopter to anestiwata part no: 91163590,qty/set: 05 nos,3) oil gauge packing to anestiwata part no: 91283000,qty/set: 05 nos,4) oil gauge set to anestiwata part no: slsp0034,qty/set:05 nos,5) oil gauge adapter to anestiwata part no: slsp0038,qty/set: 05 nos,6)stick oilgauge to anestiwata part no: slsp0041,qty/set: 05 nos,7) delivery pipe set (ac to final flange) to anestiwata part no: spcs0019,qty/set: 5 nos,8)intake filter set to anestiwata part no: slsp0035,qty/set: 5 nos,9)delivery flange assembly to anestiwata part no: spcs0026,qty/set: 05 nos,10) elbow,union to anestiwata part no: 96800282,qty/set: 05 nos,11) breather pipe to anestiwata part no: 91295000,qty/set: 05 nos,12)o-ring (delivery flange) to anestiwata part no: rr1000-35,qty/set: 05 nos,13)cooling pipe set to anestiwata part no: spcs0006,qty/set: 05 nos. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44791613 Due date: 24 Apr, 202624 Apr, 2026 NA
Tender For corrigendum : supply of set of flour silicon rubber 'o' rings as per els/aq sketch no. els/aq/wag-9/sk.no.0033/rev-02, suitable for transformer oil cooling pipes (metallic pipes) flange type-a,b,c,d,f,g,l, k & m as per abb id no: 3ehn.424150 & clw specn no. clw/es/3/0142 alt-f or latest for wag-9 loco [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44774062 Due date: 06 May, 202606 May, 2026 NA
Tender For supply of a set of silicon rubber gasket "o" rings suitable for transformer oil cooling pipes (metalic pipes) flange type- a,b,c,d,f,g,k,l & m as per abb id no: 3ehn 424150 for wag-9 loco, as per sketch no: els/aq/wag-9/sk.no. 0033/rev-0.( this is shelf life items and should be procured with staggered delivery period. supplier to mention /print date of manufacturing on the item & item to be supplied within 90 days of manufacture date ) [ warranty period: 30 months after thedate of delivery ]

CTN :44757118 Due date: 23 Apr, 202623 Apr, 2026 9.00 Lacs
Tender For fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur furnace , makin

Central Government/Public Sector

CTN :44697141 Due date: 06 Apr, 202606 Apr, 2026 9.94 Lacs
Tender For repair and rectification of cooling pipe lines in bf

Central Government/Public Sector

CTN :44598687 Due date: 04 Apr, 202604 Apr, 2026 NA
Tender For supply of 4203081491-cooling pipe assy, thre50iii

corporations/Associations/Others

CTN :44512839 Due date: 07 Apr, 202607 Apr, 2026 NA
Tender For supply of oil gun assembly with cooling pipe

CTN :44464943 Due date: 04 Apr, 202604 Apr, 2026 NA
Tender For supply of set of bend pipes from radiator to mph and transformer for 5400 kva transformer of locos (1) ss oil cooling pipe with flange for 5400 as per drg. no.- sr.dee/rs/ed/elect-129 (2) ss bellow with attachment for 5400 kva transformer as per drg. no.- sr.dee/rs/ed/elect-129.
 Loading, Please wait...

Connect us via What's Up