Get complete information related to latest Electrical Actuator Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Electrical Actuator Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Electrical Actuator Tenders.
Tender For supply of electrical spares - led head light 12v , led head light 24v , led orange light12v , led orange light 24v , led white light 12v , led white light 24v , led red light 12v , led red light 24v , ignition starter switch , head light switch , brake switch , battery lugs heavy duty big size , 12v starter motor solenoid , 24v starter motor solenoid , mf tractor front side lamp cover , 12v 3 watts bulb , 12v reverse horn , toggle switch on-off-on , two way spring loaded switch
Tender For supply, installation, testing and commissioning of electricalactuators for daily operation valves at malad hill reservoir under aeww(maint)w.s./north ii division. tender id-2025_mcgm_1215280_1.
Tender For supply installation testing and commissioning of electricalactuators for daily operation valves at malad hill reservoir under aewwmaintwsnorth ii division
Tender For supply of butterfly valve complete with electricalactuator (make: m/s fouress engineering india pvt. ltd) , gear box ( part no. 20) for electrically operated butterfly valve (make: ms fouress eng. india pvt ltd
Tender For corrigendum : supply of rotark make electricalactuator spares for boiler vents, drains, fan outlet dampers and reheater spray station - non thrust base assembly for k60f10e, actuator, thrust base assy,for k60goa actuator, thrust base assy,actuator,k300g1/g2a, thrust base assembly of k-150 f10a, centre column,for, actuator,model:k600f14e, (suitable for actuator sl.no:5w42700101), thrust bearing with washers for k60 goa, actuator.
Tender For annual maintenance of bore well motor pumps,starter panel board and supply of specials for water supply section in sandur tmc limits for fy-2025-26 - erecting and commissioning of new hand pump including fixing of gi pipes, fixing of hand pump to the borewell and giving satisfactory test etc. complete., erecting and commissioning of new hand pump india mark iii including fixing of gi pipes fixing of hand pump to the borewell and giving satisfactory test etc complete, repair top head assembly of hand pumps by removing the top head assembly replacing the wornout parts such as handle axle chain bearings reassembling after greasing in position and giving satisfactory test etc complete excluding the cost of parts required for replacement etc complete, dismantling india mark iii hand pump from position releasing plunger rods valves piston overhauling the components replace the wornout parts and re erecting in position etc with cutting threading wherever necessary adjusting the rod and giving satisfactory test etc the replaced materials to be returned to the departmental store the cost exclude the cost of parts required for replacement , dismantling india markiii hand pump from position releasing gi pipes rods pump cylinder and strainer overhauling the components replace the wornout parts and re erecting in position etc with cutting threading wherever necessar adjusting the rod and giving satisfactory test etc the replaced materials to be returned to the departmental store the cost exclude the cost of parts required for replacement, providing and greasing the chain of hand pump both india mark ii and india mark iii by removing the top head cover cleaning wanter tank and head assembly removing all dirt inside and outside the hand pump body and refixing the top head cover by fixing the bolts and nuts including replacing the bolts and nuts with new ones wherever necssary etc complete , labour charges for repairing of existing hand pump both india mark ii and india makr iii above the ground level including replacing of worn out parts such as top head inspection cover complete excluding the cost of spares, labour charges for repairing of existing hand pump both india mark ii and india makr iii below the ground level after dismantling the hand pump head assembly, water tank riser assembly plunger rods pump cylinder replacing of worn out parts in the pumpset cylinder including overhauling of cylinder cutting the gi pipes and rods and threading the same, complete excluding the cost of spares, scraping of old paints stains etc and provide painting with anti corrosive pint over a cost primer etc with approved brand of paint and primer etc. including the cost of all materials labour transportation and numbering etc as directed by the departmental officials , fishing out power pump from the borewell including the cost of labour materials with all lead and lifts etc complete , labour charges for lifting of non functioning submersible pump set along with cable and gi pipes each length 6m for 50 mm, labour charges for lifting of non functioning submersible pump set along with cable and gi pipes each length 6m for 32 mm, lifting of struck up submersible pump set. upto 300 ft , lifting of struck up submersible pump set above 300 ft , labour charges for erection of new or repaired submersible pump set along with gi pipes 32mm or 50mm cable (new submersible pump set if required will be supplied by the department free of cost and released pump set should be handed over to department) including transportation. (each length 6 m), labour charges for lowering additional gi pipes of dia 32 or 50 mm dia including transportation charges (new gi pipe required will be supplied by the department free of cost & released gi pipes should be handed over to the department (labour charges only). upto 3 mtr lengths, labour charges for lowering additional gi pipes of dia 32or 50 mm dia including transportation charges (new gi pipe required will be supplied by the dep