Web Analytics Made Easy - StatCounter

End Wall Tenders

Get complete information related to latest End Wall Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic End Wall Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding End Wall Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40901687 Due date: 07 Jul, 202507 Jul, 2025 2.55 Lacs
Tender For construction of proposed breast wall, protection wall at rd 4/440 to 4/464.

State Government

CTN :40881554 Due date: 05 Jul, 202505 Jul, 2025 4.64 Lacs
Tender For protection work by constructing of breast wall of kandi to athed road k.m. 0/0 to 12/0

Central Government/Public Sector

CTN :40882588 Due date: 18 Jul, 202518 Jul, 2025 9.51 Lacs
Tender For provn of breast wall near building no t-419 at zakhama military station under age (i) zakhama

Central Government/Public Sector

CTN :40888265 Due date: 01 Jul, 202501 Jul, 2025 NA
Tender For set of end wall assly for lhb slrd amrit bharat coaches. note:-(1)in drawi ngs "mig welding (131) is to be read as tig welding (141)" as per design letter no. md462 31 dated 16.03.2024. (2)firm shall collect all latest/final drawings before manufacturi ng. there may be minor modification in design ., as per drawing: mp24ewalslrdab version 5 , packing instruction: 1. the supplier shall pack the end wall in a suitably designed returnable fixture in such a way that end wall shall not get scratched, damaged, twis ted during transportation, storage and lifting and to avoid scratches on outer surfa ce. it should be seperated by suitable environment friendly blocks to avaoid rubbing o f two endwall surfaces . it should have standard clamping /fastening mechanism so th at it can be opened easily. it should have firm's identification mark. 2. first returanable fixture along with end wall be retained by rcf & this fixture shall be exchanged in the second lot supply and so on. at the end of the contact, the firm shall collect the rem aining returnable packing fixture from rcf. 3. the packing fixture/frame to be fabricated having sufficient strenght to bear approximate 2 tonne load in static & mov ing condition of two coach sets of end wall. 4. the fixture /frame/pallet should be desi gned so that the packed end wall preferably remain in vertical position to minimize sur face area. 5. it should also be suitable for storage of end wallunder open sky. [ warra nty period: 30 months after the date of delivery ]

State Government

CTN :40880289 Due date: 19 Jul, 202519 Jul, 2025 NA
Tender For supply and installation of lv busducts for rsps-2 in tnpl unit-i - lv busduct 415v, 4000a, 3 ph, 4 wire, non-segregated al. (total no. of busduct is 2 nos.), route length of busduct (4000a, 3ph,4w), 90 deg bend., adaptor box at transformer end., adaptor box at switchgear end., tinned cu. flexible at transformer end, tinned cu. flexible at switchgear end, aluminium expansion joint in the run., rubber bellow assembly at transformer end, wall frame assembly with sealing plate, space heater, marshalling box assembly, silica gel breather, phase cross over assembly, drain plug, hot dip galvanized structure for supports for bus ducts, lv busduct 710v, 3200a, 3 ph, 4 wire, non-segregated al. (total no. of busduct is 1 no.), route length of busduct (3200a, 3ph,4w), 90 deg bend., adaptor box at transformer end., adaptor box at switchgear end., tinned cu. flexible at transformer end, tinned cu. flexible at switchgear end, aluminium expansion joint in the run., rubber bellow assembly at transformer end, wall frame assembly with sealing plate, space heater, marshalling box assembly, silica gel breather, phase cross over assembly, drain plug, hot dip galvanized structure for supports for bus ducts, spares, silica gel breather, lump sum fees for erection services, the scope includes installation and commissioning of 3 sets. of lv busducts along with accessories at tnpl unit-i rsps-2 project site.expenditure towards boarding, lodging and local conveyance shall be in bidder s scope.

CTN :40840319 Due date: 15 Jul, 202515 Jul, 2025 6.34 Crore
Tender For restoration and repair of batote khellani road existing nh 244 by way of laying of bituminous macadam and bituminous concrete, breast wall, pucca and kachha drain, culverts, road marking and road transverse strips, delineators, flickering cat eyes

State Government

CTN :40824070 Due date: 01 Jul, 202501 Jul, 2025 NA
Tender For restoration of road damages caused due to laying of optical fiber cable on nh-503 a. at km 0/0 to 70/00 (sh:- construction of breast wall and v-shape drain at km. 24/500 to 24/507.30(rhs). deposit work

State Government

CTN :40831573 Due date: 30 Jun, 202530 Jun, 2025 1.91 Lacs
Tender For repairrestoration of rain damages on jole khurwain road km 000 to 8400 sh co breast wall at rd 6828 to 6848 near house of smt asha devi dc deposit

State Government

CTN :40831614 Due date: 30 Jun, 202530 Jun, 2025 NA
Tender For /o breast wall /edge wall at r.d.0/400 to 0/422 and p/l p/l 900mm dia r.c.c. hume pipe culvert at r.d. 0/398

Central Government/Public Sector

CTN :40837477 Due date: 29 Jul, 202529 Jul, 2025 NA
Tender For end wall assembly note:-in drawings " mig welding (131) is read as tig weldi ng (141) " as per design letter no. md46231 dated 16.03.2024 , as per drawing: lp15112 alt. ' h' & mdts21332 rev-00 dated 09.06.2020 ,fitted alongwith shutter complete to drg.no. 2 10113.0.76.300.012 alt'-r1', packing instruction: 1. the supplier shall pack the end wall in a s uitably designed returnable fixture in such a way that end wall shall not get scratch ed, damaged, twisted during transportation, storage and lifting and to avoid scratch es on outer surface. it should be wrapped with enviroment friendly material and it sho uld have standard clamping /fastening mechanism so that it can be opened easily. it sh ould have firm's identification mark. 2. first returanable fixture along with end wall b e retained by rcf & this fixture shall be exchanged in the second lot supply and so on. at the end of the contact, the firm shall collect the remaining returnable packing fixt ure from rcf. 3. the packing fixture/frame to be fabricated having sufficient strenght to bear approximate 2 tonne load in static & moving condition of two coach sets of en d wall. 4. the fixture /frame/pallet should be designed so that the packed end wall pre ferably remain in vertical position to minimize surface area. 5. it should also be suitabl e for storage of end wallunder open sky. [ warranty period: 30 months after the date of deli very ]
 Loading, Please wait...

Connect us via What's Up