Get complete information related to latest Foundation Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Foundation Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Foundation Work Tenders.
Tender For through overhauling and repairing of two nos clariflocculator bridge and rail base foundationwork under serampore water treatment plant, kmda.
Tender For corrigendum : construction of viaduct with pile foundation, rcc pier, rcc or psc girder and reconstruction of re wall with the replacement of backfill and ground improvements in the remaining approaches of rob at km 28.200 in the jabalpur to hiran river section of
Tender For supply, installation, foundationwork, and commissioning of air cooled electrically driven fixed speed with inlet modulation, oil lubricated screw type air compressor with acoustic enclosure. capacity -500 cfm, 10 kg/cm2 in accordance with attached technical specifications and scope of work..tolerance of 10% (+/- 10 %) in motor rpm may be accepted. hence speed of the main motor should be 1500 (+/- 10 %) rpm. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of octagonal single pole 9 meters , base plate assembly , anchor bolts with nuts and washers , led flood lights , junction box , pole ring , copper wire , cable 10mm , mcb , accessories , foundationwork
Tender For corrigendum : percentage rate contract for chapter/section no. 3,4,5,7,10,13,14 and 21 on mes ssr-2020 part-ii for foundationwork inside factory (gms) gcf, jabalpur.
Tender For corrigendum : percentage rate contract for chapter/section no. 3,4,5,7,10,13,14 and 21 on mes ssr- 2020 part-ii for foundationwork inside factory (fgs) gcf, jabalpur.
Tender For corrigendum : percentage rate contract for chapter/section no. 3,4,5,7,10,13,14 and 21 on mes ssr-2020 part-ii for foundationwork inside factory (gms and tgs) gcf, jabalpur
Tender For supply of integrated shbo and rock climbing platform , civil foundationwork and anchoring work , ms support structure , climbing wall panel system 10x3 mtr for two climbing faces each , slithering system , staircase side and acess platform , climbing holds , chain anchors belay points , climbing rope fast rope , sit harness , screw locking carabiners , descenders , assisted braking belay device grigri , safety helmet , slithering gloves