Get complete information related to latest Gi Sheet Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gi Sheet Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gi Sheet Repair Tenders.
Tender For corrigendum : shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu tc1 jk 941 a. roof assembly 94516001 000 01, alt 'nil' - 1 no. location of sidewall94514001 000 01, alt 'nil' - 1 no. end construction alarm end 94515001 000 01, alt 'a' - 1 no. end construction non alarm end 94515002 000 01, alt nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status.01,rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt nil -2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt nil - 2 nos. 5. 94410054 000 01 alt nil - 4 nos. c. underframe arrangement 94111001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201,alt 'f'. packing as per icf/j&t/sk-1809,alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframes hould be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. stage inspection. (a) raw materialstage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu ndmc jk 962 a. roof assembly 96216001 000 01 alt "a" - 1no location of sidewall 96214001 000 01 alt "nil" - 1 no end construction pail end 94515001 000 01 alt "a" - 1no end construction shunting desk side 96215001 000 01 alt "nil" - 1 no firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315,issue status 01, rev.00 with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu ndmc jk 962 to drawing nos 1. 96210002 000 01 alt "b" - 1 no 2. 96210007 000 01 alt "b"' - 1 no 3. 96210026 000 01 alt "nil"- 1 no 4. 96210046 000 01 alt "nil"- 1 no 5. 96210064 000 01 alt "nil"- 1 no 6. 94410054 000 01 alt "nil"- 2 nos 7. 94410076 000 01 alt "nil"- 1 no 8. 94410072 000 01 alt "nil"- 1 no c. under frame arrangement 96211001 000 01 alt 'd' - 1 no firm shall fulfill the manufacturing facility as per icf/md/spec-147,issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the under frame should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a) raw material stage #ensure the raw material used using portable spectrometer (b) jig stage #assembly of front part with sole bar. #assembly of modular frame arrangement. #weld parameters to be checked & recorded (c) trestle stage #marking, drilling & tapping of holes wherever necessary. #marking & placing of detail items. #complete welding wherever necessary. #weld parameters to be checked & recorded #assembly & welding of trough sheets. #dimensional & visual checks. #punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. #short/sand blast to the requirements. #painting process as per the specification. #visual inspection. #final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply, termination installation, testing and commissioning of ventilation system on roof of paint shop of lower parel workshop along with complete installation, frame work of suitable size with ms 50mmx 50 mmx 5mm, cabling, cable try work, wiring and protection system with 4 pole 20a mcb for each and mcb board along with 2.5 sqmm cable 4 core and 10 sqmm cable from panel to distribution board for main supply and power full exhaust system of length and height minimum 1 meter with width minimum 400 mm, diameter blades 900 mm, blades rotational speed -620 r/min or more. air flow 30,000 m?/h, noise level shall be less than 70 db, power shall be minimum 750 watt with the flap system and motor starter of 1 hp or as per suitable and confirming to s/iec 60947-4-1 or latest. all electrical works shall be carried out in accordance with the provision of indian electricity act 2003 and indian electricity rules 1956 amended to date and all the safety codes and procedures outlined in the safety codes shall be complied with general and safety requirement shall be governed by is 13947 (pt i) 1993 and is:8623/1993, amended to date. termination of all cables shall be done with bimetallic terminal connector suitable for 2.5 dia aluminium tubular busbar for 20a copper palm copper cu etp cw 0041a and aluminium barrel aluminium al 99.5 cable connector temperature resilience, corrosion resistance size: 2.5 sqmm confirming to is: 5561-1970 with maximum temperature rise of 90 degree celsius. material shall be confirmed to designation a6 of is: 617-1959. breaking resistance for barrel 85 n/m sq m and for palm 225 n/m sq m with stretching a5% for barrel must be for palm 2.5. type test certificate from nabl or any other govt agency lab report shall be attached along with the offer without which offer will be rejected. [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of 3 side brick wall of 9 inch thick with 4 ft height wall size 18feet 14ft 24ft 2ft with plastering , 1 inch x 1 inch square net jaali above the wall till the roof of 2mm thickness , 1 x iron frame door with 1inch x1inch square net of 2.00mm thickness size 4feet x 8feet with locking system. , false ceiling 372 sqft 18ft 18ft 24ft 2ft , tiling work in floor 372 sqft 18ft 18ft 48ft , 02 x ceiling fan with complete electric connection and switches , 04 x roof light 1feet x1feet with complete electric connection and switches , 02 x ss tables of tuffon glass top with six chairs cafeteria table and chair , painting and putty work of wall, painting of iron net with enamel paint , disposal of debris
Tender For supply of stainless steel roof turbine ventilator fan with installation , label of store printing , so register 300 pages , distilled water , wall light , round up 1 ltr , battery terminal clamp with wire , fibre sheet diamond cut white opaque , iron pole mild steel 50 sqft , iron pole mild steel 36 sqft , profile sheet 15 x 3 point 5 ft , iron pole mild steel square 3 x1 point 5 inch 16ft , iron pole mild steel 70 sqft , iron pole mild steel square 11 inch , painting , aluminum partition heavy frame with 3 ft bakelite sheet and glass 2 ft , installation and fittings of hardware accessories etc