Web Analytics Made Easy - StatCounter

Land Transport Service Tenders

Get complete information related to latest Land Transport Service Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Land Transport Service Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Land Transport Service Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :43364999 Due date: 10 Jan, 202610 Jan, 2026 NA
Tender For collection, loading, transportation and unloading of dip screw press sludge from dip plant to m-yard and intercarting of dip screw press sludge to tnpl cement plant

State Government

CTN :43377421 Due date: 21 Jan, 202621 Jan, 2026 NA
Tender For work contract for removal, handling, lifting of wet ash/mud/sludge accumulated besides ahp c/r, iph, lagoon tanks and highway culvert & its transportation to designated place at ahp, 210mw, btps

Central Government/Public Sector

CTN :43362974 Due date: 09 Jan, 202609 Jan, 2026 2.73 Lacs
Tender For collection transportation and disposal of hazardous waste wetp sludge and oil-contaminated wastes generated from opencast coal mines ukni oc junad oc kolar pimpri oc pimpalgaon oc and ghonsa oc of wcl wani north area to common hazardous waste treatme

Central Government/Public Sector

CTN :43268509 Due date: 09 Jan, 202609 Jan, 2026 NA
Tender For -custom bid for services - tender for attending fire water, raw water and other ug line leakages at mrpl aromatic complex as per boq (bidder has to quote lumpsum price higher or lower than the sor value excluding gst as per boq).-1 1050799 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 0 to 1.5 m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, . all complete as per standard specifications and diretction of engineer incharge, 2 1050800 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 1.5m to 3.0m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge, 3 1050801 earth work in excavation by manual / mechanical means below ground level in all kinds of works in all types of soils, depth 3.0m to 4.5m in any work condition irrespective of magnitude of work, work place, work space, height, degree of complications, temperature, gradient including setting out, removal of vegetation, shrubs and debris, cutting and dressing of sides in slopes, construction of shoring, strutting and bracing, leveling, grading and ramming of bottoms, dewatering up to any extent of accumulated water from any source and keeping the surface dry for subsequent works, disposal or stacking of excavated material within a lead of 2km, etc. all complete as per standard specifications and diretction of engineer incharge. 4 1050802 backfilling and compacting the soil in layers of 300mm after execution of the work to proper grade and level with selected materials from available excavated soil from soil heaps within a lead of 2.00km, including re- excavating the deposited soil excavated earlier, breaking clods, loading, transportation, unloading, spreading to required level, watering, rolling and ramming by manual methods/ mechanical compactors, dressing, trimming etc. with all tools & tackles, machinaries, labour etc complete as per standard specifications and diretction of engineer incharge. 5 1050803 transporting & disposal of the surplus earth and excavated material including shrubs and vegetations from construction area to maximum lead of 2.0 km including reexcavating the deposited soil excavated earlier, loading, transportation, unloading, laying at all depths and heights, stacking, leveling and dressing both the area (viz. from where the earth is transported and where it is deposited) to required levels and slopes all complete as per standard specifications and diretction of engineer incharge.(the work volume of surplus material shall be measured as the difference of volume of excavation & the volume of back filling.), 6 1050804 pumping out water including dewatering the water mixed with muck/sludge etc from the trenches, ponds and other miscellaneous areas including supply and installation of dewatering pumps by contractor with all labour, hoses, consumables fuel etc.complete as per the directions of engineer incha
 Loading, Please wait...

Connect us via What's Up