Get complete information related to latest Lodging Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Lodging Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Lodging Tenders.
Tender For lease for operation of guest house of zilla parishad at pakhiralaya under gosaba police station on rent basis for lodging, fooding including security for 1 year i.e. 12 months.
Tender For license for operating snack bar in sha & arrival area, vehicle parking management rights at city side and retrieval of passenger baggage trolleys in lieu of advertisement on trolleys at purnea airport
Tender For providing residential training facility (including training infrastructure, boarding & lodging, mobilization, training management, documentation, post training mobilization) for conduct of state sponsored residential training programs under "scheme for training of masons, carpenters and bar binders on hazard resistant construction" to be organized by national institute of technology hamirpur (nith).
Tender For supply and installation of lv busducts for rsps-2 in tnpl unit-i - lv busduct 415v, 4000a, 3 ph, 4 wire, non-segregated al. (total no. of busduct is 2 nos.), route length of busduct (4000a, 3ph,4w), 90 deg bend., adaptor box at transformer end., adaptor box at switchgear end., tinned cu. flexible at transformer end, tinned cu. flexible at switchgear end, aluminium expansion joint in the run., rubber bellow assembly at transformer end, wall frame assembly with sealing plate, space heater, marshalling box assembly, silica gel breather, phase cross over assembly, drain plug, hot dip galvanized structure for supports for bus ducts, lv busduct 710v, 3200a, 3 ph, 4 wire, non-segregated al. (total no. of busduct is 1 no.), route length of busduct (3200a, 3ph,4w), 90 deg bend., adaptor box at transformer end., adaptor box at switchgear end., tinned cu. flexible at transformer end, tinned cu. flexible at switchgear end, aluminium expansion joint in the run., rubber bellow assembly at transformer end, wall frame assembly with sealing plate, space heater, marshalling box assembly, silica gel breather, phase cross over assembly, drain plug, hot dip galvanized structure for supports for bus ducts, spares, silica gel breather, lump sum fees for erection services, the scope includes installation and commissioning of 3 sets. of lv busducts along with accessories at tnpl unit-i rsps-2 project site.expenditure towards boarding, lodging and local conveyance shall be in bidder s scope.