Get complete information related to latest Pedestal Unit Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pedestal Unit Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pedestal Unit Tenders.
Tender For custom bid for services - defect rectification of acsr 2 (south tower)-defect., in has reported that tracks are not available on display of acsr #2., defect identification., di for the same was undertaken on 13 jun 2025. it was found that the pedestalunit, was required to be replaced to rectify the defect., scope of work to undertake defect rectification., 1. spare part., the required pedestalunit for replacement will be provisioned by in on site. all other, components/ units of acsr #2 should be in place to operationalize the system., 2. manpower., three skilled technicians will be required to undertake the pedestal replacement work., one tower climber also needs to be available on site. the tower climber and two, technicians will be provisioned by hela., 3. material/ machinery., one overhead crane with a loading capacity of one ton lifting to a height of 35 mtrs is, required to undertake the work. the same will be provisioned by in., 4. tools and accessory., the following are required and will be provisioned by hela:-, (a) torque wrench, (b) level indicator, (c) eye hook -02, (d) two 50 mtrs rope, (e) silicon, (f) drill machine, (g) lubricant, (h) slings for lifting, 5. activity to be undertaken., the sequence of events for replacement of pedestalunit will be as tollows:-, (a) disconnect and remove all cables, wave guide ard units from the antennae assembly., (b) fitment of lifting eye hook on antenna and pass lifting slings to the eye hook. dismantle antenna from pedestalunit and keep it on even surface on, the ground with the help of overhead crane. special care is o be undertaken while handling waveguide., (c) hook on the pedestalunit on overhead crane and op an securing bolts, of pedestalunit. lift the pedestal and move to the ground with cap closed of all connectors., (d) hook up new pedestal and lift it to the tower top and w hen aligned with, the position of pedestal plate lower the pedestal on the plate and tight the nut, bolt with level indicator on top of the pedestal to confirm tht the same is at, zero level., (e) lift the antenna to the top of tower and fix it to the pede stal unit., (f) install all units of acsr on top of tower and fix connectors and waveguide to the antenna., (g) switch on power and carry out power checks and fo (hecks., (h) switch on the acsr server and carry out alignment of system to get the tracks appeared on the display., 6. safety., all man working on tower should wear safety belt, safety helmet and safety belt to be, tied on two rigid point at tower top. the man below tower for handlin activity should, wear helmet. the antennae assembly and pedestalunit should be se cured with twopoint safety rope while lifting and lowering the same to avoid any dan age to the man, and material view heavy wind, lifting jerk or swing of the crane sling., .
Tender For supply of chair high back , revolving chair high back with arm rest , dining chairs for corporate , sofa three seater , sofa one seater , 3 visitor sofa steel , centre table , wood 6 seater restaurant table , l shape table,400wx450dx650ht , back unit 1800x750 , office workstation support m s leg , office workstation widthmat , officer table,wooden , high stool wooden , steel almirah 1980 mm 4 shelves , steel filing cabinets with 4 drawers , full ht glass door book shelf , foldable heavy duty wheelchair