Tender For repair / maintenance of ug cable, main panel, main feeder pillar (mfp), sub feeder pillar (sfp) and bfl poles at bop baraguria in aor of 152 bn ( now 184 bn ) bsf under shq bsf kishanganj.
Tender For corrigendum : supply, installation, testing and commissioning of kutch and jamnagar islanding scheme as per technical specifications and scope of work. - ufr, 66kv sub-statin, rtu or equivivalent device, mfm in 66kv ss, gsm modem, 8 port switch, di card, do card, pt fuse, 66kv panel, 220kv sub-station, mfm for 66kv feeder, 220 & 132kv rtu, ai card, di card, do card, mfm for 220kv lines, cmr relay, cable for cmr relay integration, cable for mfm integration work, control cable for ufr wiring, control cable for ufr wiring, 0.5sqmm shielded cable for di/do, wiring, 12core 1.5sqmm armoured control, cable for di/ do wiring - from sic, panel to c&r panel, workstationwin 10 pro/intel 17/32 gb, ram/ 1 tb ssd, printer, ldms software, cyber security component, l3 switch at sub-station, l2 switch at sub-station, l3 switch at control centre, auxillary relay, rj45 lan cable, gps, annunciator, earthing cable for rtu and ufr panel, pt fuse, dc failure relay, 220v master panel, 220kv sic pane, 220kv slave panel, sikka 220 and sikka 132kv, connection, fodb 48 pair, liu, fo switch
Tender For work for shifting of electrical equipments from old crb to new crb and construction of new crb with boundary wall and other related civil work at raninagar ss switch yard under domkal division wbsedcl - dismantling of existing rtcc pnl from old crb and re-installation the same tyo new crb., removal of existing 1.1kv 4c x 2.5 sq. mm copper control cable from existing cable trenches and relaying the same to new cable trenches with all complete., removal of existing 1.1kv 8c x 2.5 sq. mm copper control cable from existing cable trenches and relaying the same to new cable trenches with all complete., removal of existing 1.1kv 12c x 2.5 sq. mm copper control cable from existing cable trenches and relaying the same to new cable trenches with all complete., re-installation of 30v,100 ah battery from existing crb to new crb, re-installation of 30v, 35 a automatic float cum boost battery charger from existing crb to new crb., re-installation of ac 3-phase 4w (1a) ct/pt operated amr. tri-vector 33 kv feeder meter from old crb to new crb., re- installation of a.c. 3 phase, 3w ct/pt operated amr. tri-vector 11 kv feeder meter from old crb to new crb, re-arranging for installation of data communication system including hardwares & cable with telephone modem, mri for all meters for 33/11kv sub-station having features for lan and remote connectivity along with supply of materials., relaying & dressing of existing healthy portion of 11 kv 3c, 300 sq mm xlpe cable in the new cable trenches., laying of 1.1 kv 185 sq. mm 4c , pvc cable., laying of 1.1 kv 120 sq. mm 4c , xlpe cable., laying of 1.1 kv 50 sq. mm 4c , pvc cable., laying of 1.1 kv 25 sq. mm 4c , pvc cable., laying of 1.1 kv 16 sq. mm 2c , pvc cable., laying of 1.1 kv 10 sq. mm 2c , pvc cable., making end termination joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 kv 185 sq. mm 4c , pvc cable., making end termination joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 kv 120 sq. mm 4c , xlpe cable., making end termination joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 kv 50 sq. mm 4c , pvc cable., making end termination joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 kv 25 sq. mm 4c , pvc cable., making end termination joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 kv 16 sq. mm 2c , pvc cable., making end termination joint including supply of cable lugs, glands, tapes , sockets etc of 1.1 kv 10 sq. mm 2c , pvc cable., re-installation of a.c. switch board from old crb to new crb., re-installation of d.c. switch board from old crb to new crb., dismantling of existing switchgear (shunt trip) with vcb (12kv 350mva 1250/800a) 4 panel (1in +0bc+3out) from old crb and re-installation the same to new crb., erection of switchgear (shunt trip) with vcb (12kv 350mva 1250/800a) 8 panel (2in +1bc+5out)., erection of switchgear (shunt trip) with vcb (12kv 350mva 1250/800a) 1 panel (0in +1bc+0out) (one buscoupler pnl along with adaptor), dismantling of existing switchgear (shunt trip) with vcb (12kv 350mva 1250/800a) 3 panel (1in +0bc+2out) from old crb and return to store in good condition., dismantling of existing switchgear (shunt trip) with vcb (12kv 350mva 1250/800a) 4 panel (1in +1bc+2out) from old crb and return to store in good condition., removal/uprooting & returning of different size of 1.1 kv pvc cable. qty taken l.s amount as not submitted by site office in the list of returnable materials)
Tender For replacement of 33 kv triple feeder control and relay panel by new at 132 kv sub-stations khalilabad and 132 sub-station mehdawal under etd-i, basti.
Tender For corrigendum : repair/maints /replacement of lt over head lines, lt ug cables, lt panel/feeder pillar boxes and other connected items at old klp area under ge babina
Tender For repair/replacement of feeder pillar box, busbar, lt panel, earthing and repair/replacement to security lights, street lights, gate lights, high mast and controlling panels at omq and golf areas at hqtc bangalore
Tender For repair maint of water supply distribution network raising main leakage repair attending day to day water related complaints electrical infrastructure feeder pillar box panel periodical servicing of protetive devices earting and certain miscellaneous em works
Tender For supply of modules chp a , overhauling, servicing of coal handling control room switch gear section b main bus chp a , overhauling,servicing of coal handling control room switch gear section b breaker ic, og, chp a , overhauling,servicing of coal handling control room switch gear section b panels chp a , overhauling,servicing of coal handling control room switch gear section b russian control modules chp a , overhauling,servicing of coal handling main building transfer point switch gear main bus transfer point section a, chp a , overhauling,servicing of coal handling main building transfer point of panels, chp a , overhauling,servicing of coal handling main building transfer point of russian control modules, chp a , overhauling,servicing of coal handling main building transfer point of switch gear main bus transfer point section. b, chp a , overhauling, servicing of coal handling main building transfer point of panels, chp a. , overhauling,servicing of wagon tippler, switch gear electrical wagon pusher sg room of russian breaker. , overhauling,servicing of wagon tippler, switch gear electrical wagon pusher sg room of russian resistance boxes a chp. , overhauling,servicing of wt sg sg room of wagon tippler resistance boxes, a chp. , overhauling,servicing of 0.4 kv swg sectiona, b, c, fhd swg section a, b and old and new stacker, reclaimer switch gear of chp a , overhauling, servicing of l.t. modules,panel of breaker ,ic coupler of chp, control room of bchp , overhauling,servicing of lt modules panel of breaker ,og feeder of chp, control room of bchp , overhauling,servicing of lt modules,panel of breaker , ic coupler of fuel handling control room of bchp , overhauling,servicing of lt modules,panel of breaker ,og feeder of fuel, control room of bchp , overhauling,servicing of old stacker re claimer panel , overhauling,servicing of old stacker reclaimer resistance box of bchp , overhauling,servicing of old stacker reclaimer control panel of bchp , overhauling,servicing of new stacker reclaimer panel , overhauling,servicing of newstacker reclaimer resistance box of bchp , overhauling,servicing of newstacker reclaimer control panel of bchp , servicing,overhauling and breakdown maintenances of mimic plant of chp. , overhauling ,servicing of tippler switch gear of b chp. , overhauling,servicing of wagon tippler room operator panel on off of bchp , overhauling,servicing of wagon tippler room incoming powerpanel of bchp , overhauling,servicing of wagon tippler room control modules of bchp , overhauling or servicing of wagon tippler room resistance box of bchp , overhauling or servicing of wagon tippler screw pad overhauling of bchp. , overhauling or servicing of wagon tippler over travel limit switch otls overhauling of bchp. , overhauling or servicing of wagon tippler mcc panel of tipper 11a, 11b, 12a, 12b of bchp.
Tender For annual contract for routine, breakdown & annual maintenance work of roller coal mill (type mvm-32r), coal burner panel, gravimetric coal feeder, coal pipe, mrhs & other associated works of 2x660 mw of u 5&6 at csctpp, chhabraa