Web Analytics Made Easy - StatCounter

Railway Spares Tenders

Get complete information related to latest Railway Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Railway Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Railway Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :40956365 Due date: 28 Jul, 202528 Jul, 2025 NA
Tender For dismantling and cleaning of bogie frame and conversion of the cbc coupler uncoupling arrangement of three phase locomotive at els/syh.

Central Government/Public Sector

CTN :40932913 Due date: 18 Jul, 202518 Jul, 2025 NA
Tender For supply of bogie frame with brake rigging for wag-9 locomotive. bogie frame complete as per clw spe c.no.clw/ms/3/bogie/003 alt-2 or latest and drg.no.1209-01.112-202 alt-nil or latest along with brake gea r arrangement and details for wag9hc loco to clw drg/spec no.1209-01.116-059 alt-5 or latest and 1209- 01.216060 along with pipe line arrangement as per clw drg. no.1209-12.017-032 alt-1 or latest suitable f or brake system in fitted condition [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40932168 Due date: 08 Jul, 202508 Jul, 2025 NA
Tender For supply of set of rib & channel for strengthening bogie frame arrangement of 13 t icf coaches to drg. no.cg-17066, alt.-4 consisting of 03 items as per annexure attached. packing instruction: each item to be packed separately duly labeled with description & drawing no. [ warranty period: 30 months after the dat e of delivery ]

Central Government/Public Sector

CTN :40782475 Due date: 18 Jul, 202518 Jul, 2025 NA
Tender For corrigendum : supply of bogie frame with brake rigging for wag-9 locomotive. bogie frame complete as per clw spe c.no.clw/ms/3/bogie/003 alt-2 or latest and drg.no.1209-01.112-202 alt-nil or latest along with brake gea r arrangement and details for wag9hc loco to clw drg/spec no.1209-01.116-059 alt-5 or latest and 1209- 01.216060 along with pipe line arrangement as per clw drg. no.1209-12.017-032 alt-1 or latest suitable f or brake system in fitted condition [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :40932725 Due date: 23 Jul, 202523 Jul, 2025 NA
Tender For supply of set of complete bogie items for bogie of memu/dmc (air spring suspension 180kn) as per rdso spec. no. c-9202(rev.02) consisting the following. a) bogie frame arrangement as per rcf drawing .no.em03150, alt-c, qty-01 n o./set. b)bogie bolster arrangement as per rcf drg.no em04110, alt-c, qty-01. no/ set. c) bogie brake arrangement as per icf drawing no.089-3-2-064, col-i, alt-j, qty-01 no/set. [ warranty period: 60 months after the date of delivery ]

Central Government/Public Sector

CTN :40917662 Due date: 22 Jul, 202522 Jul, 2025 NA
Tender For supply of set of rib & angle for strengthening bogie frame arrangement of 13 ton icf co ach bogies to drawing no. goc/c/md-3-15420 consisting of 04(four) items, detailed mentioned in an nexure-ii, is attached . [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :40763192 Due date: 05 Aug, 202505 Aug, 2025 NA
Tender For supply of bogie frame arrangement for 1600hp ac-ac dmu/dpc coaches, as per drawing: dmu/dpc/ss-0-3-001 alt.'gr2' col.1 (without bush to drg. no. emu/m-3-2-060), packing instruct ion: bogie frame (pl nos:- 35327017, 30984348, 30986000, 30985912) each guide on bogie fra me to be properly wrapped with biodegradable transparent plastic sheet. machined por tion of bogie frame components should be covered with suitable eco friendly cushioni ng material. wooden/suitable spacers having adequate strength to be provided betwee n bogie frames to prevent rubbing against each other during transportation/loading/ unloading. supplier to ensure that bogie frame should be transported with utmost saf ety till unloading in shell depot so that components are not damaged fitted on bogie f rame and dimensions duly maintained. a list (easily visible) should be pasted on each bo x showing po no. , pl no., description, drawing. no./spec, qty, firm's name & address and dispatch detail etc. for identification. transit damage if any shall be at the cost of sup plier. , proction procedure: as per drawing [ warranty period: 66 months after the date of deliver y ]
 Loading, Please wait...

Connect us via What's Up