Tender For rate contract for manufacturing and supply of pre stressed mono-block concrete sleeper (pretensioned type thick web switchexpansionjoint (rdso drg. no. t-8838) sleepers )
Tender For maintenance of 2x25 kv high rise over head equipment on new makarpura - sachin section from dfcc km 286.08 to 425.00 of dfccil including new udhana, new gothangam, new sanjali, new varediya & new makarpura connectivity to indian railways for a period of 24 (twenty-four) months under cgm surat unit
Tender For track related work against sanctioned work through weld renewal (twr) of 1604 numbers of welds with replacement of 87 numbers of switchexpansionjoints (sejs) in rajula-pipavav and dhasa-rajula section
Tender For manufacture and supply of grsp for switchexpansionjoint to rdso drg. no. t-4159, alt-02/ latest alteration (12 nos. grsp in one set) specification: irs t-55-2025 with latest corrigendum as on date of closing of tender. [n.b. term- latest- wherever used will mean the alteration/corrigendum up to the actual date of closing of tender.
Tender For corrigendum : rate contract for manufacturing and supply of thick web switchexpansionjoints (twsej) with all fittings as per rdso drg. no. t-8822, alt.4 except ercs, liners, psc sleepers for long welded rail for bg 60e1 rails (upto 100mm permissible movement at each end) as per specifications irs:t- 10- 2025 and irs:t - 62 - 2025 . latest rdso drawing and latest specifications as amended upto date of closing of tender shall remain applicable. valid for 02 (two) years
Tender For rate contract for manufacture and supply of thick web switchexpansionjoint (twsej) with 60e1a1 thick web tongue rails and 60e1 stock rail of r260 grade (upto 100mm permissible movement at each end) for lwr b.g (1673mm) for 60e1 rail on psc sleepers to rdso drg no. t-8822
Tender For supply, installation and commissioning of one set of equipment/system for measurement/determination of stress free temperature of lwr/cwr for indian railways and executing the work of measurement/determination of stress free temperature of lwr/cwr and further analysis for taking maintenance decisions for a period of one year which will cover all seasons of the year or 500 kms whichever is more.