Tender For supply of polyurethane spring pads for secondary springs of 3 phase locomotives to id 199mm; od 310mm and thickness of 6mm. material and testing: thermoplasticpolyurethane spring pads (happy pads) for locomotives as per rdso spec no mp.0.40.99.01(rev 03) of aug 2017. note: hardness of the spring pads to be maintained between 90- 95 shore 'a' as per is 868. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of led light fitting for berth reading light (longitudinal berth) for lhb coaches, as per drawing: rdso/pe/spec/tl/0091-2026,rev-2 with drg. sked 1006 as per drg lw76093, alt 'a' type-"f1" (2 watt), rcf, annex-1,2&3, packing instruction: light fittings:- each fittingto be wrapped with biodegradable plastic bubble sheet and packed in a card board boxes( single ply corrugated). finally upto 24 lights to be packed in a card board box ( double ply corrugated ) and tied with 3 packing strips horizontally and 3 vertically. detachable diffuser if applicable with light fitting as per drg/spec shall be supplied in separate packing with each diffuser wrapped with biodegradable plastic bubble sheet and packed in a card board boxes( double ply corrugated)and tied with 3 packing strips horizontally and 3 vertically. quantity of diffusers in a box shall be matching with the no. of corrosponding light fitting in each box. the material used for product packaging shall be eco-friendly. a list should be pasted on each box showing order no ,pl no, description of the item, drg.no/spec.no, qty,firm's name & address and date of despatch etc.[ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of led light fitting for compartment, doorway and gangway (9w),, as per drawing: icf/std-7-6-061 alt. 'nil' rdso/pe/spec/tl/0091-2026 (rev.2) with drg. sked 1006, packing instruction: light fittings:- each fitting to be wrapped with biodegradable plastic bubble sheet and packed in a card board boxes( single ply corrugated). finally upto 24 lights to be packed in a card board box ( double ply corrugated ) and tied with 3 packing strips horizontally and 3 vertically. detachable diffuser if applicable with light fitting as per drg/spec shall be supplied in separate packing with each diffuser wrapped with biodegradable plastic bubble sheet and packed in a card board boxes( double ply corrugated)and tied with 3 packing strips horizontally and 3 vertically. quantity of diffusers in a box shall be matching with the no. of corrosponding light fitting in each box. the material used for product packaging shall beeco-friendly. a list should be pasted on each box showing order no ,pl no, description of the item, drg.no/spec.no, qty,firm's name & address and date of despatch etc. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of thermoplasticpolyurethane spring pads (happy pads) for secondary springs of 3 phase locos as per ref. no. 1 of s.c. rly drg. no. c/els/lgd/bogie/3/140, alt-2 & rdso spec no. mp.0.40.99.01 rev. 03, august 2017. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of led light fitting for corridor (18w), 1090 mm, as per drawing: icf/std-7-6-063, alt 'a' rdso/pe/spec/tl/0091-2026 (rev.2) with drg. sked 1006, packing instruction: light fittings:- each fitting to be wrapped with biodegradable plastic bubble sheet and packed in a card board boxes( single ply corrugated). finally upto 24 lights to be packed in a card board box ( double ply corrugated ) and tied with 3 packing strips horizontally and 3 vertically. detachable diffuser if applicable with light fitting as per drg/spec shall be supplied in separate packing with each diffuser wrapped with biodegradable plastic bubblesheet and packed in a card board boxes( double ply corrugated)and tied with 3 packingstrips horizontally and 3 vertically. quantity of diffusers in a box shall be matching with the no. of corrosponding light fitting in each box. the material used for product packaging shall be eco-friendly. a list should be pasted on each box showing order no ,pl no, description of the item, drg.no/spec.no, qty,firm's name & address and date of despatch etc. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For supply of thermoplasticpolyurethane spring pads (happy pads) for secondary springs of 3 phase locos as per ref. no.- 1 of s.c.rly drg. no.- c/els/ lgd/bogie/3/140 (alt.-2) [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : supply of thermoplasticpolyurethane spring pads (happy pads) for primary springs of 3 phase locos as per ref. no. 2 (6 mm thickness) of s.c.rly drg.no. c/els/ lgd/bogie/3/163 & rdso spec no. mp.0.40.99.01 rev. 03, august 2017 [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of lavatory out side mirror, size:-l:600 x b:400 x thichness:5 mm for lhb coaches as per rcf drg.no.mi004725,alt-h,item no.6 & specification no.is:3438-1994 and quality aa/ssq as per is:2835-1987.all sharp corner of mirror should be grinded.biodegradable self-adhesive plastic lamination sheet to be provided on each mirror followed by wraping in biodegradable bubble sheet all around,each mirror to be packed in cardboard box.nylon strips to be provided on both sides of the box. make:-modiguard or similar. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of frp side wall panels for lhb slr hog coaches (31-seater). follow colour shade as per l.no. md46271 dated 18.01.2021., as per drawing: mplsplwslrd version 2, packing instruction: frp ceiling sheet/side wall panels/frp component self adhesive biodegradable plastic lamination sheet to be provided on each component. projected metallicparts to be protected with plastic/nylon/frpcaps/proper wrapping of biodegradable bubble sheet from all the sides. each component to be packed in biodegradable bubble sheet all around with proper tapping & then to be placed in cardboard box followed by 3nylon strips tightened from both sides. then collective packs of components to be packed in wooden cage made from wooden strips of size 100x20mm & gap between each strip should not be more than 100mm.on the wooden crate base 3 wooden pegs of size100x100mm (along the length) to be provided for ease in handling with fork lifter. all loose items of a set to be packed separately in cardboard box with list of loose items pasted on each box and collective packs of item to be packed in wooden cage made from wooden . roof ceiling (having curved surfaces) in addition to above packing should be stacked on a metallic frames before packing in the wooden boxes. one package should not contain material belonging to more than one coach set & grouping should be preferably of similar sizes. also packing should have indication like 1/4,2/4 etc. ( e.g. four packings will make one coach set) so that one complete coach set can be easly identified.the maximum weight of the wooden crate should not be more than 200 kgs. a list should be pasted on each wooden crate showing order no, pl no. description of item,drg no/spec no/set list no. with version, qty, firm's name & address,date of despatch etc. [ warranty period: 84 months after the date of delivery ] ]