Get complete information related to latest Track Hopper Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Track Hopper Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Track Hopper Tenders.
Tender For complete cleaning of ash, dust, oil, grease, waste materials, cobweb from different floors, walls, ceilings, walkways, structures, railings, staircase etc. of trackhopper, different tps, stacker reclaimer area, dust suppression pump house
Tender For corrigendum : assistance to operation and routine and breakdown maintenance works of trackhopper, unloading of bobr rakes and operation of track points in coal handling plant btps
Tender For rehabilitation work of thick deposited coal debris over rail gauge at back & forth end of trackhopper on companys bg railway track at 2x250 mw, dspm tps cspgcl, korba east
Tender For work contract for laying of two air pipe line at trackhopper along with fitment of cooling water line of air compressor at atps mppgcl chachai.
Tender For handling and positioning of raw materials, housekeeping and machine cleaning at foundry-1 910002479 supply of usw for handling & positioning of raw materials and house keeping & machine cleaning in foundry: assistance in moulding section in all shifts. mixing,shifting and positioning of moulding sand and other operational consumbles of moulding section including material collection from stores. 6,666.000 mdy,. 2 910002480 supply of usw for handling & positioning of raw materials and house keeping & machine cleaning in foundry:cleaning and spillage removal of sand plant area; both over and underground; including 22 nos belt conveyors, 8 nos bucket elevators,sand aerators, mix mullers etc including tunnels 1,818.000 mdy, 3 910002481 supply of usw for handling & positioning of raw materials and house keeping & machine cleaning in foundry: housekeeping and m/c cleaning and spillage removal of moulding machines, tool room m/cs, de systems like scrubbers,cyclone,bag filters etc and other connected equipment 1,212.000 mdy, 4 910002482 supply of usw for handling & positioning of raw materials and house keeping & machine cleaning in foundry: assistance and cleaning at pattern shop including cleaning of m/cs and shop floor and house keeping in pattern storage area and designated areas outside pattern shop 1,212.000 mdy, 5 910002483 supply of usw for handling & positioning of raw materials and house keeping & machine cleaning in foundry: cleaning and house keeping at moulding and melting areas including material storage areas in all five bays( an area of 11,232 sq mtrs) and cleaning of office buildings 1,818.000 mdy, 6 910002484 supply of sw for welding and fabrication works including gas cutting and welding for mould box repair, mould box reinforcement and spillage metal removal from mould boxes and reuse of boxes 1,818.000 mdy, 7 910002485 supervisor:(to supervise all the above jobs and to co ordinate with the engineer or his representative for daily works and deployment) 606.000 mdy, 8 910002478 supply of usw for handling & positioning of raw materials and house keeping & machine cleaning in foundry: assistance in melting section in all shifts, cleaning of ladles,ingot mould assembly and other connected melting jobs including collection of materials from other departments and stores etc. 4,242.000 mdy.
Tender For repairing of damaged portion of over head structure of bobr trackhopper including its columns, beams and crises cross of bhojudih coal washery.
Tender For btps - chp - engaging of 02no back hoe loaders of engine capacity not less than 48hp for clearing of grid jams at wagon tippler-1,2 and on trackhopper-1a,1b grid for facilitating further unloading of coal tipper and also for removal of spilled over coal while unloading of coal trucks pouring back the same into the respective grids and also for clearing the chain conveyor jams at contingency arrangement-1,2 on round the clock basis for arraigning uninterrupted coal feeding to the units-1,2,3,4 of btps for the period of 45 days from 16.05.2025 or from actual date of commencement of work.