Get complete information related to latest Track Hopper Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Track Hopper Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Track Hopper Tenders.
Tender For corrigendum : comprehensive annual maintenance contract for hitachi make electronic interlocking ei stationof trackhopper control room central yard east cabin east m3 yard west cabin west m4 yard of wagon tippler line at ntpc sipat for twoyears 2026 28
Tender For corrigendum : providing of custom bid for services - 200138011 balance painting work of trackhopper, stacker cum re-claimer and conveyor galleries & structures of chp of st-i (3x200mw) & st-ii (3x500 mw) at ntpc korba, on risk and cost of vendor m/s kinsfolk infrastructure de..
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - ore handling plant; lt motors & ac annual rate contract welding machine; service provider
Tender For tggenco ytps 5x800mw chp clearing of accumulated coal on the rails, poking of solid caked coal and hammering of boulders and clearing of shales on the trackhopper1 grid wagon tippler 1, 2 grid, clearing of sticky wet coal by poking inside coal wagons, opening of bobrn wagon doors for unloading of coal, engaging cutter or welder for opening or closing of welded wagon doors whenever required and clearing of apron feeder dribble conveyor jams, along with tools and tackles for unloading and any other coal clearing works as instructed by engineer incharge for 50 days from 10.06.2026 or actual date of commencement for the fy 2026 27.
Tender For tggenco ytps chp clearing of accumulated coal on the rails, poking of solid caked coal and hammering of boulders and clearing of shales on the trackhopper2 grid or wagon tippler 3, 4 grid, clearing of sticky wet coal by poking inside coal wagons, opening of bobrn wagon doors for unloading of coal, engaging cutter or welder for opening or closing of welded wagon doors whenever required and clearing of apron feeder and dribble conveyor jams, along with tools and tackles for unloading and any other coal clearing works as instructed by engineer in charge for 50 days from 10.06.2026 or actual date of commencement work for the fy 2026 to 27.
Tender For name of the work / . contract no: - scope of work/technical specifications etc.1. up keeping, cleaning work of 88.8 sqm area (22.20 sqm area/day/machine) of machine housing, operator cabin, undercarriage track chain and rollers mud etc. of 04 nos. hydraulic shovels (be700, tata hitachi zx650h sl no.001166 and pc2000-8 sl no.1 & 2) working at khadia project for a period of 365days.2. material handling of lubricants barrels, loading and unloading of 04 nos. hydraulic shovels (be700, tata hitachi zx650h sl no.001166 and pc2000-8 sl no.1 & 2) and 02 nos. surface miners working at khadia project for a period of 365days. 3. assistance in repair and maintenance work in all the three shifts including general shift of 02 nos. surface miners, running under marc. note: maximum deployment of manpower for the above scope of work likely to be 1. semi-skilled for 730 nos. of manshift & un-skilled for 2555 nos. of manshifts.standard terms & conditions- all the safety materials (safety helmet, safety shoes, gloves and other safety equipment s) are to be provided / arranged by the contractor., labour charges for material handling & cleaning works of hydraulic shovels and surface miners as per scope of work including contractor profit., labour charges for assstance in maintenance and repair work of 02 nos surface miners running under marc including contractor profit., total impact of gst for the purpose of ctc
Tender For engaging of 1 no. shovel 75 hp for clearing of grid jams at trackhopper-2 for facilitating further unloading of coal rakes on round the clock basis for arranging uninterrupted coal feeding to the units of ytps for a period of 1 month from actual date of utilization
Tender For engaging of 1 no. shovel 75 hp for clearing of grid jams at trackhopper-2 for facilitating further unloading of coal rakes on round the clock basis for arranging uninterrupted coal feeding to the units of ytps for a period of 1 month from actual date of utilization