Tender For providing of custom bid for services - 200154587 - contract for general insulation works in tg & aux for 2 years 2026-2028 at stage-i&ii tmd/ntpc tstps kaniha
Tender For providing of custom bid for services - mrpl tender no 3420000130 item code 1025400 dc 33301 catalyst change over jobs as per tender document and as per boq bidder has to quote lumsum including gst,custom bid for services - item code 1025401 hourly rate for carrying out additional jobs as per tender document and as per boq bidder has to quote lumsum amount for 497 hours including gst,custom bid for services - item code 1044312 scaffolding erection & removal outside the reactor related to inspection jobs as per tender document and as per boq bidder has to quote lumsum amount for 5250 m3 including gst,custom bid for services - item code 1044314 buffing/ sandering outside reactor, around the nozzles for inspection as per tender document and as per boq bidder has to quote lumsum amount for 100 m2 including gst,custom bid for services - item code 1044316 cut and reweld insulation supports provided on the reactor shell as per tender document and as per boq bidder has to quote lumsum amount for 2000 id including gst
Tender For supply of set of armature striping tools (customized designed), one set consisting of 04 items as follows: (i) power coil removing large chisel as per kpa drg no-31/035,item no- 06,qty-01 no. (ii) insulation & coil lead removing chisel as per kpa drg no-31/038,item no- 01,qty-01 no. (iii) wedge cutting chisel as per kpa drg no-31/038,item no- 03,qty-01 no. (iv) deckinsulation removing chisel as per kpa drg no-31/038,item no- 02,qty-01 no. [ warranty period: 30 months after the date of delivery ] ]
Tender For providing of custom bid for services - fabrication and repair work of generator encloser utility house pump skids and dg exhaust thermal insulation at rig e1400 5
Tender For providing of custom bid for services - drg226b013 lining up of agency for encon field survey (passing of psv, control valves), compressed air leak, nitrogen leak and insulation survey of steam and hot process lines for period of 2 years