Tender For survey, investigation, design, supply, erection, testing and commissioning of tank filling scheme for filling 32numbers of mi/zp tanks of gudavi(head works consisting of construction of barrage, in take trough with forebay, jack well cum pump house, verticalturbinepumps coupled to motors, pump house electrical works, necessary valves, delivery pipe, manifold system, electrical panel, soft strater, capacitors, 11kv transformer, 11/0.433 kv sub station, 11 kv power line and 11 kv terminal bay, rising main, pressure distribution) in soraba taluk by lifting water from varada river near gudavi village including operation & maintenance for a period of five years after successful commissioning of the work for gudavi tank filling scheme works on turnkey basis
Tender For extension of 3.3kv overhead line from main patch to jarlahi face to feeding power of additional 4000gpm motor pump in socp muraidih amp colliery.
Tender For inspection, lifting, dismantling and other works for verticalturbinepump q-4318 m3/hr, h-20.11 meter, model- vt-44-32-1-stage, make- wpil, pump sl. no.- 4 at intake raw water of falta mathurapur mega water supply project under smd, phe dte.
Tender For supply of spare parts for verticalturbinepump - 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , intermediate brg. bush material thordon part no 2801 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , loose stuffing box material astm a890 gr cd4mcun part no 2401 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , gland sleeve material astm a276 uns s31803 part no 2106 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , water thrower material nitrile rubber part no 2070 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , split collar material astm a276 uns s31803 part no 2060 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , solid muff coupling material astm a276 uns s31803 part no 2050 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , intermediate shaft material astm a276 uns s31803 part no 1805 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , top shaft material astm a276 uns s31803 part no 1804 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , pump shaft material astm a276 uns s31803 part no 1800 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , impeller distance piece material astm a276 uns s31803 part no 1704 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , impeller nose cap material astm a890 gr cd4mcun part no 1651 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , impeller wear ring material is 318 ltb2 part no 1600 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , impeller material astm a890 gr cd4mcun part no 1504 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , neck ring material astm a890 gr cd4mcun part no 1181 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , diffuser dely. material astm a890 gr cd4mcun part no 1030 1 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo. , diffuser. stage material astm a890 gr cd4mcun part no 1030 as per drawing no 81313695 10cs pump s. no 81313695 10 pump model no cne3ac 3 stage pump make m s wilo.
Tender For tender for supply of repaair of mt vehicle c c -king pin system dismantling overhauling and supply replacement of the following unserviceable spars parts. , king pin set both side , king pin bearing , king pin oil seal , king pin bush , cutter pin , cheara pin , lathe work , brake system dismantling over hauling and supply and replacement of the following unserviceable parts , wheel linning with repeat , front wheel outer bearing , wheel oil seal , wheel cylinder kit , brake oil , wheel check nut , 4 four wheel hob greasing after dismantling all the spare as for the job to be done , wheel grease , brake drum 04 nos tuining , master cyclinder dismantling overhauling and supply fittings of the following spares parts , mobile with mobile filter and diesel filter changing new , diesel filter with ring , engine oil make castrol , dismantling fuel injection pump for overhauling and replacing the following unsv parts with new parts all as directed , element , nozzle , delivery valve , feed pump repair kit , bearing , oil seal , feeding pump overhauling and supply replacement of the following us spares parts , both clutch cylinder upper lower opening dismantling overhauling and supply replacement of the following unserviceable spare parts , supply fittings fixing of the following spare items as where required with labour charge , looking glass oute big , front bumper corner set , das board tool box cover , mudguard flap , front cabin show corner , fuse box cover , gear lever kit , front glass , door driver side , door lock both side , electric line checking and reparing with supply replacement of the required spares parts as needed , indicator light assy front , bulb 1176 1141 1016 , fog light hg bulb , parking light assy , ignation switch system complete assy , radiator both tank opening cleaning washing and refittings the same after leakages. , radiator hose lower , coolant , distilled water , fuel tank opening from vehicle and refittings the same at its original position after washing cleaning and minor repairing , 04 four sets road spring set opening dismantling retention reassembeling refittings complete with supply replacement of the following spare parts , spring bush rubber , spring bush brass , central bolt , silencer box taken from the vehicle and opening the clutch system portion and refittings the same after changing of the following spares parts , complete gear box taken from the vehicle and opening the clutch system portion and refittings the same after changing of the following spare parts , clutch plate , pressure plate assy , pilot bearing , oil cooler opening checking and charging with new supply replacement of the following items , dynomo carbon bush holder , self carbonbush and ameature , testing of vehicle on road after completion of work for smooth running upto entire satisfaction of age em bagdogra
Tender For 15th cfc 2023-24 supply, delivery and installation of 20000 x 50 m / h (approx 150 hp ) verticalturbinepump set 1 no and maintenance work at lower camp head works pump room and chlorination room in cumbum municipality.