Web Analytics Made Easy - StatCounter

Wooden Crates Tenders

Get complete information related to latest Wooden Crates Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Wooden Crates Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Wooden Crates Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government / Public Sector

CTN :45710507 Due date: 06 Jul, 202606 Jul, 2026 NA
Tender For auction sale of depot miscellaneous scrap - (b) pl. no.98413200, w-6/jun-26/01: scrap wooden crates /offcuts /sleeper pilers etc, mostly firewood as available in the lot. (qty. 65 mt)

State Government

CTN :45723212 Due date: 14 Jul, 202614 Jul, 2026 NA
Tender For auction sale of metallic, non-metallic - disposal of unserviceable/obsolete items as per annexure-i (wooden crates, polythene cover black, empty al.ph3 bottles & miscellaneous etc.)

Central Government/Public Sector

CTN :45652396 Due date: 02 Jul, 202602 Jul, 2026 NA
Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45664839 Due date: 03 Jul, 202603 Jul, 2026 NA
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]

State Government

CTN :45647696 Due date: 29 Jun, 202629 Jun, 2026 NA
Tender For auction sale of non-metallic - e-tender for auction of unserviceable wooden crates lying at various centers under fci do hisar.

Central Government/Public Sector

CTN :45638111 Due date: 20 Jul, 202620 Jul, 2026 NA
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45544552 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For supply of set of aluminium items of wjcc coaches for bangladesh railway., as per drawing: mplalblwjcc version 0, packing instruction: all types of aluminium/stainless steel mouldings/extrusion: biodegradable self adhesive plastic lamination sheet to be provided on each piece , then to be packed in gunny bags,followed by packing in wooden crates made from wooden strips of size 100x20mm & gap between each strip should not be more than 100mm .on the wooden crate base 3 wooden pegs of size100x100mm(along the length) to be provided for ease in handling with fork lifter. net weight of the material & gross weight with the packing to be indicated on each packing. gross weight must not exceed 200 kg. of each box. a list should be pasted on each crate showing order no,pl no, description of item,drg no/spec no/set list no with version,qty,firm's name & address,date of despatch etc. [ warranty period: 30 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45473583 Due date: 25 Jun, 202625 Jun, 2026 NA
Tender For supply of top bush, as per drawing: emu/m-0-6-005 alt. 'l/2' item 2, packing instruction: wrapping ingrease proof paper, packed in card box and collectively supplied in wooden crates. [ warranty period: 30months after the date of delivery ] ]

CTN :45475980 Due date: 18 Jun, 202618 Jun, 2026 NA
Tender For sale of cut material/battens/wooden crates lots regional manager bathinda /psfdc

Central Government/Public Sector

CTN :45335776 Due date: 02 Jun, 202602 Jun, 2026 NA
Tender For supply of top bush, as per drawing: emu/m-0-6-005 alt. 'l/2' item 2, packing instruction: wrapping ingrease proof paper, packed in card box and collectively supplied in wooden crates. [ warranty period: 30months after the date of delivery ] ]
 Loading, Please wait...

Connect us via What's Up