Get complete information related to latest Hydraulic System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hydraulic System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hydraulic System Tenders.
Tender For corrigendum : supply of power steering system of american crane model 5450 t spare parts as per catalogue f f - power steering assembly part number 197461 , ring snap 7g32726 , ring snap 7g32417 , ring snap 7g32727 , dw seal 7g3266615 , washer 7g36524nf , head 7g36522 , o- ring seal 7g32077 , rod piston , seal rod 7g32131 , piston ring set 7g406 , piston 7g34614 , nut 7g32464 , cylinder body , pin 7g407 , block 7g408 , lubrication fitting 7g32013 , repair kit 7g2897 , wheel hub 110120 , air brake chamber 222227 , air brake chamber 814583 , boom dog air valve 807472 , swivel joint assembly l4802 , planet spider assembly 114449
Tender For supply delivery and fitting fixing of gaseous chlorination items for the standby system of clear water pumping station and supply of 1 no empty chlorine tonner at ibs uporgora under chhatna, saltora block sub-surface water based piped water - supply and delivery of gaseous chlorination unit spares (0-10kg) & (0-4kg)kg/hr. require of wallace & triman evoqua, vacuum regulator (wall/cylinder mounted)with auto switchover facility, capacity 0-10 kg/hr max, evoqua make s10k scale controller, capacity 10.0kg/hr, manual control, evoqua make 1 injector suitable for 40 psi backpressure, fitting fixing of the above new supplied spares on the existing position part by part with new ejector pipe line with necessary fitting materials and necessary welding job by expert mechanical complete the job as per direction of eic and as per is:10553., supply and delivery at site of 1000 kg empty chlorine tonner hydraulic test pressure 30 kgf design as per asme section viii div.1 with hot-forged steel hook and a safety tongue piece, add: 18% gst, add: 1% cess
Tender For supply delivery and fitting fixing of gaseous chlorination items for the standby system of clear water pumping station and supply of 1 no empty chlorine tonner at intake kukrakuri under chhatna, saltora block sub-surface water based piped - supply and delivery of gaseous chlorination unit spares (0-10kg) & (0-4kg)kg/hr. require of wallace & triman evoqua, vacuum regulator (wall/cylinder mounted)with auto switchover facility, capacity 0-10 kg/hr max, evoqua make s10k scale controller, capacity 10.0kg/hr, manual control, evoqua make 1 injector suitable for 40 psi backpressure, fitting fixing of the above new supplied spares on the existing position part by part with new ejector pipe line with necessary fitting materials and necessary welding job by expert mechanical complete the job as per direction of eic and as per is:10553., supply and delivery at site of 1000 kg empty chlorine tonner hydraulic test pressure 30 kgf design as per asme section viii div.1 with hot-forged steel hook and a safety tongue piece, add: 18% gst, add: 1% cess
Tender For supply of plywood 19mm bwr md table storage sides , plywood 12mm bwr wall panelling cabinet sides , plywood 8mm- shutters, drawer fronts , laminate sheet table top and cabin accent , veneer sheet md table top and front , concealed hinges hettich or ebco all shutters , drawer slides full extension ebco ball bearing , cabinet handles ss bar pull 160mm cc brushed chrome , tape all exposed ply edges , md l shape executive table fabrication labour , full height wall storage cabinet fabrication labour , decorative wall panelling fabrication labour , reception counter fabrication labour , solid wood flush door md cabin walnut veneer both sides , wooden pelmet or ceiling box over window blind concealment , carpenter labour skilled site fabrication and finishing , helper labour carpentry material handling and assist , 2.5 sqmm frls copper wire power points and ac circuits , 1.5 sqmm frls copper wire light and fan points , 4.0 sqmm frls copper wire ac dedicated circuit , 25mm isi pvc conduit pipe concealed wiring , 20mm isi pvc conduit pipe light circuits , modular switches 6a legrand or havells with ms box , modular 16a power sockets 5 pin with 6a switch , mcb distribution board 8-way double door surface mount , led recessed downlight 22w philips or havells warm white , earthing pipe gi 40mm with charcoal salt treatment , light point wiring and fixing labour concealed conduit per point , power socket point wiring labour 2.5sqmm per point , ac point wiring labour - dedicated 4sqmm circuit , db installation and testing labour mcb earthing load test , led light fixture installation fixing connection testing , 600x600mm vitrified wood carpet area , laying labour levelling grouting cleaning , pop work , wall putty all walls 2 coats asian paints or birla , wall primer asian paints primer plus 20l , premium acrylic emulsion walls , obd white distemper ceiling asian paints tractor emulsion 20l , paint tools and consumables brushes rollers masking plastic , pu or nc polish wooden furniture nc or pu polish 1l tin , wall putty labour 2 coats 1000 sqft walls , wall painting labour primer plus 2 coats emulsion , ceiling painting labour 2 coats 250 sqft , pu polish on furniture labour sanding primer 2 pu coats , biometric unit fingerprint rfid , 12v smps power supply em lock 2a dc adapter , exit push button ss flush mount n o contact with label , hydraulic door closer dorma or stanley en3 rated , biometric installation labour wiring programming testing , l shape fabric sofa cream or off white 3 plus 2 seater 36d foam hardwood frame , fabric sofa bed cream or off white 2 seater 36d foam hardwood frame , sofa installation and placement labour assembly positioning levelling , visitor chair white shell moulded polypropylene chrome legs , md executive high back chair leatherette lumbar tilt adjustable , reception desk chair mid back mesh or fabric chrome base , zebra day night roller blind all windows motorised or manual , aluminium track and brackets blind per running foot , blind installation labour brackets hanging adjusting
Tender For corrigendum : supply of mill hydraulic line spares - mill hydraulics line spares with stand pressure 300 kg / cm 20 mm od pipe ms sechedule 80(6 mtrs), 20 mm elbow with connecting nut (g.i / m.s), 20 mm x 20 mm straight connector with connecting nut (g.i / m.s), ferulles for 20 mm od pipe (g.i)
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; hydraulic cap job work; service provider
Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot