Web Analytics Made Easy - StatCounter

Drum Mix Plant Tenders

Get complete information related to latest Drum Mix Plant Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Drum Mix Plant Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Drum Mix Plant Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :45722698 Due date: 14 Jul, 202614 Jul, 2026 NA
Tender For supply of hydraulic nut splitter cutting tool, cutting force : 16 ton, cutting range : m12 to m30, make :- voltz / force or similar [ warranty period: 30 months after the date of delivery ] ]

State Government

CTN :45508218 Due date: 23 Jun, 202623 Jun, 2026 7.83 Lacs
Tender For drum mix plant (dm-45) special repair spares parts for the year 2026-27 for tejgadh plant site at chhotaudepur.

State Government

CTN :45462730 Due date: 20 Jun, 202620 Jun, 2026 NA
Tender For annual rate of hotmix material for various roads under rajpipla (r&b) division rajpipla (2026-27) - providing and laying premix semi dense bituminous concrete with b.t. aggregate as per morth gradation & using bitumen emulsion rs-1 as per is 8887: for tack coat @2.50 kg./10 sq.m. on bt surface with asphalt grade vg-30 for mixing @ 50.00 kg./m.t. including heating and mixing the aggregate and asphalt by continuous of batch mix plant and hot laid process laying with paver finisher and consolidation with roller as per morth specification to achieve desire density, including cost all materials equipments, tools and plants, oil, kerosene, firewood, labour charges etc. complete using contractor's own machineries batch mix plant and paver finisher etc. complete. plant and paver finisher etc. complete. providing and laying 50 mm thick bituminous macadam with b.t. aggregate as per morth specification and using bitumen emulsion rs-1 as per is 8887: for tack coat @2.50 kg. / 10 sq.m. on bt surface with mechanical sprayer and bulk asphalt vg 30 for mixing @ 34.00 kg./m.t. i.e. 3.40 percentage of total weight of mix including heating and mixing the aggregate and asphalt in continuous of drum mix plant and hot laid process spreading the same by paver finisher and consolidation with roller as per morth specification to achieve desire density, including providing all materials equipments, tools and plants, fire wood, oil, kerosene, labour charges etc. complete using contractor's own machinery drum mix plant and paver finisher etc. complete. providing & laying bituminous grout 37.5 mm thick compacted with asphalt of vg 30grade @ 1.99 percentage by weight of mix for mixing and 2.5 kg/10 sqm. of rapid curing emulsion for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt premix materials by hot mix process in proper gradation and laying with sensor paver finisher and consolidation work as per most specifications including cost of materials labours labour equipment and plant fuel oil complete.... providing and laying 250mm thick wet mix macadam (w.m.m.) in two layers (each layer of 150mm avearge) using machine crushed black trap aggregate of 40 to 50 mm size in the material with water omc in mechanically mix (pug mill) carriage of mix material by contractor's 1.000 own tipper to site of work including laying, spreading and compacting in sub base, base course on well prepared under base of compacting as per most specification to achieve the desired density (mechanically providing & laying bituminous prime coat asphalt @ 7.5 kg / 10 sqm. of slow curing emulsion as per most specifications including cost of materials labours labour equipment etc. complete..... labour charges for spreading hotmix / drum mix material on scattered area of road by manually in regular shape including surface dressing with wire brush and spreading of sand including cost of sand. complete. (for patch work) labour charges for spreading hotmix / drum mix material by paver finisher including heating and spraying tackcoat as per requirement consolidation by static roller and spraying stone dust as directed etc. complete. providing and laying asphalt painting on b.t. surface with bitumen v.g. 30 at rate of 5 kg./10 sq.mt. and spreading stone dust on painting surface at the rate of 0.03 cu.mt. / 10 sq.mt. in selected length of the road including rolling and cost of asphalt. providing. laying built-up spray grout base course intwo layers with bitumen at rate of 15 kg./per 10 sq.m. with 0.50 cu.m. stone aggregate for first layer and 15kg. of bitumen and 0.50 cu.m. of stone aggregate per 10 sq.μ. of roadsurface for second layer and using 0.13cu.m. of key aggregate per 10 sq.m. excluding rolling and consolidation complete. (stone aggregate and bitumen shall be paid separately) surface dressing two coat with bitumen using 18kg.bitumen per 10.0 sq.m. with 0.15 cu.m. of stone chipping 12mm nominal size per 10.0 sq.m. for first coa

Central Government/Public Sector

CTN :45436825 Due date: 17 Jun, 202617 Jun, 2026 NA
Tender For supply of 30 meter long extension hoses. technical specification (1) dimension & length details of hydraulic hoses - 1d 1/4" x 10 mtr long (2) details of end connection - male stud coupling (3) pressure upto which can be used - 500 bar (4) testing pressure -700 bar. material required for working with hydraulic rock splitter [ warranty period: 24 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45454854 Due date: 15 Jun, 202615 Jun, 2026 NA
Tender For supply of hydraulic rock splitter- technical specification as under (1) type of wedge set - regular, (2) suitable in drill hole dia -45-48 mm (3) splitting distance -20-50 mm (4) splitting force kn/ton-6061/618 (5)splitting force actual kn/ton -3507/358 (6) length of splitter - 1290 mm, (7) drill hole depth - 610 mm, (8) capable of developing a crack of mtr - 1.5 mtr (9) min length of wedges (i) counter wedge - 350 mm (ii) centre wedge - 600 mm [ warranty period: 24 months after the date of delivery ] ]

Central Government/Public Sector

CTN :45405542 Due date: 23 Jun, 202623 Jun, 2026 NA
Tender For supply of high-strength alloy steel hydraulic nut splitter cutting tool, cutting force : 16 ton, cutting range : m12 to m30. the hydraulic cylinder, piston, and structural components shall be made of corrosion-resistant alloy steel suitable for operation at high pressure (up to approx. 700 bar), cutting blade: hardened tool steel (alloy steel, shock-resistant). make :- voltz or force or similar. [ warranty period: 30 months after the date of delivery ] ]

CTN :45421992 Due date: 18 Jun, 202618 Jun, 2026 NA
Tender For supply of hydraulic nut splitter cutting tool, cutting force : 16 ton, cutting range : m12 to m30, make :- voltz / force or similar [ warranty period: 30 months after the date of delivery ] ]

State Government

CTN :45366438 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of ukai taluka dist- tapi.- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, a kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fin wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finishe etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in on layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver , finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant. machineries and eginment , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil, kerosene fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq

State Government

CTN :45366446 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of songadh taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene abour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tac coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including tolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oi ubricants, labour charges, using contractor's own drum mix olant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual _aying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one ayer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg1 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of cotal mix including heating and mixing in drum mix plant and cransporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oi ubricants labour charges using contractor's own drum mix , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing ag

State Government

CTN :45366458 Due date: 05 Jun, 202605 Jun, 2026 50.5 Thousand
Tender For annual rate 2026-27 rates of supplying, stacking bituminious materials and labour work on various roads of valod taluka dist- tapi- providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and mannual finish etc. complete. (manual laying) , providing & laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99% by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat & using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractor's own machinaries, drum mix plant and paver finisher etc. complete. (paver finish) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4% i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractor's own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying) , providing, laying & rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt/10smt. stone chips for one miton as per specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying) , providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one miton as per considering 0.6 specification, using the asphalt at rate 33.60 kg/m.ton (ie. 3.36% by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consolidation with vibratory roller with necessary equipments oil kerosene, fire wood labour charges etc comp.with contractor's own machineries and equipment tools etc. complete in accordance with the requirement. (paver finish) , providing & laying seal coat with b.t. agg. as specifed using agg. at the rate of 0.24 cu.mt/10sq.mt.and bitumen vg-30 for mixing agg. at the rate of 4.50% i.e. 45.00 kg/m.t. and 2.5kg/10 smt asphalt vg-30 for tack coat including heating & mixing in hot/drum mix plant & transporting & spreading the same by manual laying & consolidation with vibratory roller incl. necessary firewoood, oil, lubricants, labour charges etc. using contractor's own drum mix plant, ma
 Loading, Please wait...

Connect us via What's Up