Tender For supply of the cost of basic machine "hydraulic press-200 ton", cost of concomitant accessories, cost of anyother accessories which in the opinion of supplier is essentially required for making machine fully functional,cost of turnkey charges viz. foundation, installation & commissioning etc., duties,and taxes, insurance and freight asper tender specification [ warranty period: 24 months after the date of delivery ] ]
Tender For supply of the cost of heavy duty metal cutting machine,cost of concomitant accessories, cost of any other accessories which in the opinion of supplier is essentially required for making machine fully functional,cost of turnkey charges viz foundation, installation & commissioning etc.duties and taxes, insurance and freight as per tender specification. [ warrantyperiod: 24 months after the date of delivery ] ]
Tender For corrigendum : tender for supply of equipment material design erection testing commissioning for sop to ms shyam indus pvt ltd co prittam singh at vill baghni by prov 1104kv 25kva sstn aw 3ph lt line in vill baghni in e section bhadwar under esd hpsebl nurpur. t - 25 kva trsanformer, prov. distribution transformer (ordinary), 11/0.4 kv, 25 kva ., prov. steel tubular poles (9 m, working load > 200 kgf/m ) ., prov. muffs with concerete filling, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for incomer line, prov. ms angle iron (50x50x6 mm), length: (2800 mm) x1 nos for las, prov. x-arm: [channel iron (75x40x6 mm), length : (2800 mm x 4 nos] for supporting do fuse unit & go switch, prov. transformer bed, belting & knee bracing, prov. x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 2 nos] for transformer bed, prov. x-arm [channel iron (100x50x6 mm), length : (460 mm) x 2 nos for supporting main channel of transformer], prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (35x35x5 mm), length : (460 ) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (950 mm) x 2 nos for bed knee bracing, prov. transformer lt distribution box and go switch fixing assembly, prov. ms angle iron (50x50x6 mm), length : (2800 mm) x 2 nos, prov. ms angle iron (50x50x6 mm), length : (450 mm) x 1 nos, prov. go switch handle supporting: [channel iron (75x40x6 mm), length : 460 mm, prov. go ab switch unit (11kv, 400a, 25 ka ) tripple pole o/d type, prov. d.o fuse unit, prov. lighting arrester, 9 kv station class (porcelain type), prov. discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), prov. stay set complete, prov. stay wire (7/3.15 mm) (6.0 kg per stay set), prov. pipe earthing set, prov. lt distribution panel box with mccb(160a, 10ka, 4p, 1no) & sfu(32a, 5no, rewirable), prov. half clamp (m.s. flat 50x6 mm), prov. full clamps (m.s. flat 50x6 mm), prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. aluminium thimble, prov. copper thimble 35 amp, prov. danger plate, prov. barbed wire, prov. lt cable (3.5 core) 50 mm , prov. energy meter 3- , 4 wire ct operated static tri-vector meter with box(ct-100a), prov. aluminum paint., prov. 6/1/3.35, 50mm ., prov. construction of foundation of transformer, erection of 25 kva s/stn. i.e. digging of pit for pole & earthing two no. poles & 3 nos. for earth drilling of holes in x-arms, preparation of plateform str. members c.i., a.l. i.e. x-arms & k.b. set, errection of d/p, concreating of rcc muff errection of plateform, errection of x-arms, d.o., l.a., mccb, switch lt box, energy meter, errection of transformer, earthing connection to g.o. switch, transformer l.a. etc., errection of stay set, jumper, pipe earthing 3 nos set, l.t. cable, barbed wire and painting complete in all respect., transportation charges @10490/-, prov. transportation charges & mannual carriage of 25 kva pole mounted distribution s/stn. (line length 0.500km), erection of 3- ph. lt line, prov. aaac (7/3.15 50mm ) { neutral conductor including 1% (sag, jumpering and wastage}, prov. steel tubular poles (8 m, working load > 200 kgf/m )., prov. muffs with concerete filling, prov. shackle insulator with d-iron, prov. lt stay set i/c egg insulator., prov. nuts and bolts of various sizes (galvanised / coated) [preferably 16 mm or more (with flat and spring washers)], prov. stay wire, prov. g.i wire no 8swg, erection of 8 mtr. st pole single structure i.e. digging of pit, fixing of insulator, x-arms, k.b. set, top clamp, barbed wire, danger plate, drilling of holes and filling of pit + ramming complete in all respect., sagging of conductor i.e. laying, stringing and sagging & binding with insulator (single wire per km)., sagging of g.i i.e. laying, stringing and sagging & binding with insulator (single wire per km)., erection of stay
Tender For execution of protective work for safety of existing tower foundation to prevent soil erosion at location no. 51 (n) of 220 kv d/c latehar- daltonganj (pgcil) transmission line under the jurisdiction of 400/220/132 kv gss, latehar.
Tender For foundation construction, erection and stringing of dc nb 60 tower plus 9m extension, for proposed 110kv feeders 1nkpn and 1pnav in connection with the construction of 110kv substation panthalacode.
Tender For construction of main internal gutter tambati dattamandir to mori and shri.dattatray mhamunkre foundation to main road at tambati in v.p tambati tal khalapur
Tender For bhagot block: kanina panchayat: bhagot dist.: mahendragarh annual maintenance work for water supply. - foundation new m.s with hole / foundation for motor pumping machinery make of iron grills, water works, baghot
Tender For supply, installition/arrangement of various construction, supply, installation, of various components/items viz, pedestal inauguration/foundation, shamiyana, seating arrangement, etc. stone for inauguration/foundation stone laying ceremony of variou