Tender For auction sale of empty barrel good 210 ltr 18/22kg,25kva transformer, non-repairable without oil, with aluminium winding,m.s.iron scrap, pole, i beams, cross arms,scrap single phase energy meter(electrostatic),scrap 3 phase energy meter (electrostatic)
Tender For supply of pipe band equipments and band uniform- pipe band set ,girls band uniform ,,boys band uniform, bag pipe with box ,bag pipe feeds ,practice chanter ,practice chanter ,reeds ,side drum set ,tenor drum ,brass drum ,,leader stick (ceremonial) ,leader stick practice ,practice stick, band jacket/coat ,skirt/trouser ,cap (peaked/feather cap) ,shirt (white) ,necktie/cravat ,waist belt (golden buckle) ,gloves (white) ,shoes (black, formal/boot) ,shoulder cord (lanyard) ,epaulettes (golden/silver) ,drum major baton ,sash/cross belt
Tender For overhauling repairs to water turbine driven horizontal pumping unit at achoora gurez of misd hajin. - overhauling/major mechanical repairs/replacements of damaged non-functional mini water driven turbine (damaged by heavy snow slide) coupled with 03 cusec horizontal pumping unit. the job comprises of following works: pump sidei. engaging of labours in the machine drive chamber by way of moving of boulders and other trash till the machine chamber be cleaned and washed., ii. temporary oiling the turbine and pumping unit on machine chamber side till the the mechanism of machinery is free from rust and dust, then decoupling the pumping unit from the turbine coupling and genset from belting. using skilled labour and other tools and tackles., iii. dismantling of 8 x8 horizontal pumping unit from its existing pump foundation to machine floor smoothly without any hammer stroke using skilled job knowing personnel., iv. dismantling of the pumping unit parts at machine floor,removing of defective rotating kit assembly from the pump body using proper tools to be arranged by firm., v. shifting of the dismantled kit assembly with the allied accessories and defective chain pulley block to road side upto the lead of 150 m by head loading and then loading the rotating kit assembly in private load carrier to be arranged by the firm and shifting to workshop for conducting necessary repairs., vi. complete servicing of rotating kit cum bearing housing at workshop using diesel oil till the whole bearing assembly and rotating parts are washed and cleaned and free from rust and dirt. the job includes dismantling of bearing housing and removing of defective parts like damaged shaft, broken bearings and other items smoothly. the job includes removing of broken bolts from the bearing housing, re-tapping the damaged holes and providing and fitting of new holes., vii. repairs to impeller shaft of the pump by way of rebuilding the damaged portion using arc welding and then machining, polishing, threading completely till the size of the shaft is brought to required specifications. the job further includes providing and fitting of check nut as per sample., viii. manufacturing/providing and fitting of gm bush to suction part and gm cooling ring, gm gland with bolts. the job includes casting, machining, finishing to proper dimensions., ix. providing and fitting of high pressure gasket on suction side and delivery side., providing and fitting of ht bolts of assorted size, xi. rebuilding the wearing ring seats of suction and coupling end plates using ci welding electrodes. the job includes machining and finishing to proper dimensions., xii. repairs to defaced/ damaged impeller shoulder ring seats using ci welding electrodes. . the job includes machining and finishing to proper dimensions., providing and fitting of taper roller bearing on coupling side and gland side. the job includes greasing of bearing xiv. 32315, xv. 32314, xvi. assembling of bearing housing with rotating kit at workshop to check the rotating kit assembly is free from any obstacles and loading and shifting to site in private load carrier to be arranged by the firm including haltage and retun back of workers, turbine side:- repairs to turbine side by way of:complete cleaning and washing of turbine chamber by way of removing of boulders and other trash from the turbine by engaging of labours.complete servicing/ washing/oiling of turbine assembly in turbine chamber till the assembly of turbine and guide vanes are free from the rust and dust and then complete oil washing the guide vanes, guide hinges and outer body of turbineproviding and fitting if turbine shaft gm bush bearingtesting of turbine assembly on no-load decoupled from pump assembly by way of charging of turbine chamber to check the vibration, sound, rpm, setting of turbine guide vanes, hinges to ensure smooth functionre-installation of pumping unit by way of fitting of rotating kit assemblycomplete painting by black japan to entire pu
Tender For corrigendum : the work of shifting of line full deposite scheem at various place under edd-sadabad hathras. - safe carriage of following material from electricty store center hts to pit site of work through the kacha and pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, t&p, etc. which required for proper completion of work.(distance 00-50 kms.), 8.5/9 mtr. long pcc poles., 9/11 mtr. s.t. poles, acsr weasel conductor, earthing complete, shackle insulator, stay set complete, teoff channel, 33/11 kv pin insulator with pin, disc insulator with disc fitting, f bracket, 11 kv x-arm, 50/95/120 sqmm. ab cable, suspension clamp, dead end clamp, distribution box with clamp, pearcing connector, guarding angle with clamp, g.i wire 6/8/10 swg, neutral cum earth wire, cable jointing kit, 11 kv xlpe cable, 25 kva t/f, 63 kva t/f, 100 kva t/f, errection of following poles including cutting of kharanja/mettalic road/concrete portion while digging pit & complete h.t./l.t. fittings as per respo manual and as per direction of engineer incharge including the cost of labour, t&p and carrier etc. required for proper completion of work., pcc poles 8.5/9 mtr., stp 9.0/11 mtr., errection and grouting of stays as per respo norms and as per direction of supervising engineer. grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost., fixing of earthing rod as per respo norms and as per direction of supervising engineer., safe installation of following new/repaired cousted t/f on newly constructed double pole in proper alignment direction & making all ht/lt connection., 25 kva t/f, 63 kva t/f, 100 kva t/f, laying, sagging and stringing and jumpering / binding etc. of new & old acsr weasal conductor / gi in 11 kv / lt lines as per respo manual and as per direction of supervising engineer., acsr weasal conductor, 50/95/120 sqmm. ab cable, xlpe cable, providing & fixing of following clamps, 11 kv x arms clamps for stp/pcc pole, nut,bolt & washer, 11 kv f clamp for stp/pcc pole, earthwire clamps, lt clamp with nut & bolt, cable jointing kit, cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer, guarding/reguarding of 11 kv line by laying, stringing, sagging and binding of 2 nos. parallel gi wire 6 swg after providing, fabrication and fixing of guarding angle and fabrication and fixing of x-guards (tillis) of gi wire at distance of 3 mtr., installation of extra t on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, t&p etc, required for proper completion of work. the "t" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material., dismentlling and removal of existing line from the various area, dismentlling of pole stp/pcc, back cartage, acsr weasel conductor scrap, iron scrap