Web Analytics Made Easy - StatCounter

Integral Coach Factory Tenders - ICF Tenders

Get complete information related to latest Integral Coach Factory Tenders - ICF Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Integral Coach Factory Tenders - ICF Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Integral Coach Factory Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :45077286 Due date: 11 May, 202611 May, 2026 NA
Tender For supply of brooms/brushes made of cocoa fibre for cleaning floor 18"x4"(457x102mm)wooden head holding the bristle and coir bristle area (420x80mm) and length76mm with wooden handle 4 1/2" to 5" long 1" thick (round).(1.372mm/1.52m x25.4mm. ]

Central Government/Public Sector

CTN :45077420 Due date: 08 May, 202608 May, 2026 NA
Tender For supply of leathr safety gloves to specificationno.icf/safety/spec.no.15.revisionstatus:04 ]

Central Government/Public Sector

CTN :45077288 Due date: 11 May, 202611 May, 2026 NA
Tender For supply of ss box with reset push button (pre-wired) as per icf/drg no icf/sk3 7-5-030 alt nil. [ warranty period: 36 months after the date of delivery ]

Central Government/Public Sector

CTN :45015237 Due date: 14 May, 202614 May, 2026 NA
Tender For corrigendum : supply of set of compartment ic doors for lwfcwac as detailed below 1. mounting arrangenent of compartment door to drg no mi006624-1 no 2. mounting arrangement of compartment door to drg no no mi006636-1 no 3. mounting arrangement ofcompartment door to drg no no mi006635-1 no [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :45077287 Due date: 11 May, 202611 May, 2026 NA
Tender For supply of brake chopper resistor unit to m/s. medha servo drives part list sp675uv2101012. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44841850 Due date: 06 May, 202606 May, 2026 NA
Tender For corrigendum : supply and installation of one pair of bodyside entrance door for lhb (lh & rh) to drg no. 58151003 col.i alt 'e' -1 no & 58151004 col.i alt.'e' -1 no. special condition : 1) installation required as per assy drg and annexure a, dtd 13-09-2023 to be followed. 2) supply rates and installation rates to be quoted separately. 3) packing condition as per icf/j&t/sk-1866.[safety item ]

Central Government/Public Sector

CTN :44842214 Due date: 14 May, 202614 May, 2026 NA
Tender For corrigendum : supply of bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "n", col-ii (or) (b) icf/mrvc/d/bt-0-3-001, alt "c", col -ii along with damper fixing bracket to drg. no. (339)ac/dcemu/d6-0-1-602,col.i - 4 nos andbolt complete to drg. no. emu/m/3ph-0-2-002, alt "c", col.i - 16 sets bogie frame to be supplied without nylon bushes where ever applicable and shall confirm to rdso/specn.c-9202, rev-2 or latest. the firm shall fulfil the requiremnt as per icf/md/specn/147, issue status 01, rev-02 with amendment no- 02. special condition : - suppliers commitment will be there to supply as per drawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoption of conical spring ). - one month notice willbe given to vendor whether he has to supply as per drawing - (a) or drawing - (b). -rate quoted will be applicable to both drawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap to format icf/ims/md/f-31 shall be prepared along with relevant documents and kept ready for developmental/educational order. iii)firm should supply bogie frame along with the dimensional report, stress relieving report and radiography films. iv) firm should have induction/electric furnace for stress relieving of bogie frame. v) prototype inspection is applicable only for first time of developmental/educational order. vi) stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b)welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warrantyperiod: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :45011716 Due date: 06 May, 202606 May, 2026 NA
Tender For corrigendum : supply and installation of pre assembled dismantable frp modular toilet for lgs /eog coaches to drg.no.lgs/eog-6-3-002,alt-m and as per specn. icf/md/spec-384, issue status-01,rev-00, amd-01 and 02. please visit icf vendor portal for downloading drawing https://vp.icf.gov.in/vendtendordetnew.php using key: 0725ltxf1ga1649 [ warranty period: 84 monthsafter the date of delivery ]

Central Government/Public Sector

CTN :45077545 Due date: 12 May, 202612 May, 2026 NA
Tender For supply of variable frequency drive, 2.2 kw / 1.5 kw input; ac3ph, output: ac3ph as per thedetailed description. item not listed in gem.detailed description is attached in documents. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :44945989 Due date: 12 May, 202612 May, 2026 NA
Tender For comprehensive annual maintenance contract of 160 kva ups in the shell division for a period of three years.
 Loading, Please wait...

Connect us via What's Up