Tender For supply of one coach set of tool box for kolkatta metro coaches to drg. no.mrm/dtc- 6-4-015, col-ii, ant-nil. [ warranty period: 30 months after the date of delivery ]
Tender For supply of chain assembly to drawing icf/sk3-6-1-122, col-i, alt-d. please visit icf vendor po rtal for downloading drawing https://vp.icf.gov.in/vendtendordetnew.php using key: 0725bjry9tt281 3. [ warranty period: 54 months after the date of delivery ]
Tender For supply of one coach set of arrangement of air duct for memu/dmc/3ph coaches to dr g.no.memu/dmc/3ph-6-4-004, col-i, alt-nil. please visit icf vendor portal for downloading drawing https://vp.icf.gov.in/vendtendordetnew.php using key: 07253xnmm752114 [ warranty period: 30 m onths after the date of delivery ]
Tender For supply of roof arch complete to drg no: 58116092, col.i, alt 'b'. special condition : suitab le packing to be done to avoid damage during transit, unloading and rust prevention d uring storage. [ warranty period: 30 months after the date of delivery ]
Tender For supply of one coach set of partition frames for (lhb eog) lwlrrm shells to drg. no.lp 10139, anx-5. special condition : - packing condition as per icf/j&t/sk-1865. [ warranty period: 30 months after the date of delivery ]
Tender For supply of one coach set of abs plastic notices to specification icf/md/spec-3 17 for kolkata metro tc/mc coaches to drg.no 651-6-4-007,alt-e, col-iv.(except items 11,1 3 & 14). [ warranty period: 30 months after the date of delivery ]
Tender For supply of master controller suitable for hoist application of eot cranes, 4 step, 6-0-6 seq uence, as per specification enclosed. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of one coach set of frame work, carline and welding parts for amrit bharat lscn/pp2 (755 ) to drg nos, 1. frame work to drg nos 75514008, alt 'b' - 1 no. 75514012, alt 'a' - 1 no. details in colu mn i in the drgs above to be supplied loose. 2. carline assembly to drg nos 75514009, alt 'a' - 1 no. 75 514013, alt 'a' - 1 no. 3. welding parts to drg nos 75514004, alt 'f' - 1 no. 75514005, alt 'c' - 1 no. 4. h ousing for led destination board to drg nos 87414028, alt 'b' - 2 nos. to be supplied in coach set. spe cial condition : this is a new build and there will be minor changes in drawing. firm shall obtain final drawings from icf before start of manufacturing. packing drawing icf/j&t/s k-1865 alt-'a'. [ warranty period: 30 months after the date of delivery ]